IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,715

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0704 # 09 Y:2016 09 2016 INSTALL SKYLIGHTS $3,375 $0 Implemented
AM0704 # 10 Y:2016 10 2016 TURN OFF EQUIPMENT WHEN NOT IN USE $2,510 $0 Implemented
AM0704 # 11 Y:2016 11 2016 USE PHOTOCELL CONTROLS $2,440 $650 Implemented
AM0704 # 12 Y:2016 12 2016 OPTIMIZE PLANT POWER FACTOR $918 $3,100 Implemented
AM0704 # 13 Y:2016 13 2016 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $320 $0 Not Implemented
CO0721 # 01 Y:2016 01 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,340 $1,500 Implemented
CO0721 # 02 Y:2016 02 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,680 $57,330 Not Implemented
CO0721 # 03 Y:2016 03 2016 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM $3,080 $13,230 Not Implemented
UA0157 # 01 Y:2016 01 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $19,132 $35,339 Not Implemented
UA0157 # 02 Y:2016 02 2016 INCREASE AMOUNT OF CONDENSATE RETURNED $2,932 $5,240 Not Implemented
UA0157 # 03 Y:2016 03 2016 INSTALL / REPAIR INSULATION ON STEAM LINES $320 $215 Not Implemented
UA0157 # 04 Y:2016 04 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $658 $100 Not Implemented
UA0157 # 05 Y:2016 05 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $430 $1,520 Implemented
IP0061 # 01 Y:2016 01 2016 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $7,775 $4 Implemented
IP0061 # 02 Y:2016 02 2016 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $2,745 $0 Implemented
IP0061 # 03 Y:2016 03 2016 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,196 $35 Implemented
IP0061 # 04 Y:2016 04 2016 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $931 $20 Implemented
IP0061 # 05 Y:2016 05 2016 INSTALL OCCUPANCY SENSORS $5,310 $1,611 Implemented
IP0061 # 06 Y:2016 06 2016 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $9,664 $3,260 Implemented
IP0061 # 07 Y:2016 07 2016 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,734 $760 Not Implemented
IP0061 # 08 Y:2016 08 2016 RECYCLE WHITE WATER $61,804 $36,000 Implemented
IP0061 # 09 Y:2016 09 2016 INSTALL AN UNINTERUPTABLE POWER SUPPLY $230,000 $251,000 Not Implemented
IP0061 # 10 Y:2016 10 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $20,505 $75,569 Implemented
WM0084 # 01 Y:2016 01 2016 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $20,124 $83,912 Implemented
WM0084 # 02 Y:2016 02 2016 RECOVER WASTE HEAT FROM EQUIPMENT $17,305 $34,684 Not Implemented