Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,708
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AS0326 # 07 Y:2002 | 07 | 2002 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS | $12,362 | $100 | n/a |
AS0325 # 01 Y:2002 | 01 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $12,971 | $23,524 | n/a |
AS0325 # 02 Y:2002 | 02 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,032 | $60 | n/a |
AS0325 # 03 Y:2002 | 03 | 2002 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $3,721 | $92 | n/a |
AS0325 # 04 Y:2002 | 04 | 2002 | USE SYNTHETIC LUBRICANT | $308 | $279 | n/a |
AS0325 # 05 Y:2002 | 05 | 2002 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $2,009 | $4,550 | n/a |
AS0325 # 06 Y:2002 | 06 | 2002 | TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY | $670 | $240 | n/a |
AS0325 # 07 Y:2002 | 07 | 2002 | INITIATE A TOTAL QUALITY MANAGEMENT PROGRAM | $15,570 | $588 | n/a |
AS0325 # 08 Y:2002 | 08 | 2002 | CLEAR AND RENT EXISTING SPACE | $107,840 | $21,700 | n/a |
AS0325 # 09 Y:2002 | 09 | 2002 | RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS | $68,428 | $9,216 | n/a |
LM0036 # 01 Y:2002 | 01 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $203,445 | $95,480 | Implemented |
LM0036 # 02 Y:2002 | 02 | 2002 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $2,227 | $1,335 | Implemented |
LM0036 # 03 Y:2002 | 03 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $15,015 | $550 | Implemented |
LM0036 # 04 Y:2002 | 04 | 2002 | UPGRADE CONTROLS ON COMPRESSORS | $19,570 | $300 | Not Implemented |
LM0036 # 05 Y:2002 | 05 | 2002 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $21,342 | $4,800 | Implemented |
LM0036 # 06 Y:2002 | 06 | 2002 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $9,928 | $23,600 | Not Implemented |
LM0036 # 07 Y:2002 | 07 | 2002 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $24,505 | $21,928 | Not Implemented |
LM0036 # 08 Y:2002 | 08 | 2002 | INSTALL SENSORS TO DETECT AND AVOID JAMS | $101,250 | $15,800 | Implemented |
LM0036 # 09 Y:2002 | 09 | 2002 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $145,152 | $2,000 | Not Implemented |
LM0036 # 10 Y:2002 | 10 | 2002 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $202,078 | $453,275 | Not Implemented |
LM0036 # 11 Y:2002 | 11 | 2002 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $199,710 | $14,000 | Implemented |
LM0036 # 12 Y:2002 | 12 | 2002 | DEVELOP STANDARD OPERATING PROCEDURES | $354,257 | $45,500 | Implemented |
IC0036 # 01 Y:2002 | 01 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,908 | $13,275 | Not Implemented |
IC0036 # 02 Y:2002 | 02 | 2002 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,335 | $22,479 | Not Implemented |
IC0036 # 03 Y:2002 | 03 | 2002 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,457 | $2,900 | Implemented |