Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,289
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NC0211 # 01 Y:2001 | 01 | 2001 | UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM | $23,426 | $20,000 | Implemented |
NC0211 # 02 Y:2001 | 02 | 2001 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $1,719 | $800 | Implemented |
NC0211 # 03 Y:2001 | 03 | 2001 | USE MINIMUM STEAM OPERATING PRESSURE | $2,014 | $250 | Implemented |
NC0211 # 04 Y:2001 | 04 | 2001 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $1,453 | $6,000 | Implemented |
NC0211 # 05 Y:2001 | 05 | 2001 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,002 | $1,028 | Not Implemented |
NC0211 # 06 Y:2001 | 06 | 2001 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $2,631 | $0 | Implemented |
NC0211 # 07 Y:2001 | 07 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,506 | $1,239 | Not Implemented |
NC0211 # 08 Y:2001 | 08 | 2001 | ADOPT IN-HOUSE MATERIAL GENERATION | $5,184 | $9,200 | Not Implemented |
NC0210 # 01 Y:2001 | 01 | 2001 | TURN OFF EQUIPMENT WHEN NOT IN USE | $29,421 | $50,000 | n/a |
NC0210 # 02 Y:2001 | 02 | 2001 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $809 | $592 | Implemented |
NC0210 # 03 Y:2001 | 03 | 2001 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,359 | $137 | Not Implemented |
NC0210 # 04 Y:2001 | 04 | 2001 | USE OPTIMUM THICKNESS INSULATION | $1,930 | $2,500 | Not Implemented |
NC0210 # 05 Y:2001 | 05 | 2001 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $31,927 | $70,000 | Not Implemented |
NC0210 # 06 Y:2001 | 06 | 2001 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $60,672 | $400,000 | Not Implemented |
NC0210 # 07 Y:2001 | 07 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $148 | $320 | Not Implemented |
NC0210 # 08 Y:2001 | 08 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $750 | $551 | Not Implemented |
NC0210 # 09 Y:2001 | 09 | 2001 | REDUCE DEFECTS BY REDUCING PRODUCT TIPPING | $32,100 | $500 | Not Implemented |
NC0210 # 10 Y:2001 | 10 | 2001 | MODIFY STORAGE SPACE TO AVOID RENTAL OF A WAREHOUSE | $121,629 | $400,000 | Not Implemented |
NC0209 # 01 Y:2001 | 01 | 2001 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $2,845 | $5,600 | Not Implemented |
NC0209 # 02 Y:2001 | 02 | 2001 | UPGRADE CONTROLS ON COMPRESSORS | $2,519 | $5,600 | Implemented |
NC0209 # 03 Y:2001 | 03 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,161 | $5,700 | Not Implemented |
NC0209 # 04 Y:2001 | 04 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $163 | $200 | Implemented |
NC0209 # 05 Y:2001 | 05 | 2001 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,886 | $2,360 | Implemented |
NC0209 # 06 Y:2001 | 06 | 2001 | CONTRACT A WOOD PALLET RECYCLING COMPANY | $675 | $200 | Not Implemented |
NC0206 # 01 Y:2001 | 01 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $373 | $100 | Not Implemented |