IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,708

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0036 # 04 Y:2002 04 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $33,201 $53,875 Implemented
IC0036 # 05 Y:2002 05 2002 INSTALL SET-BACK TIMERS $1,686 $582 Not Implemented
IC0036 # 06 Y:2002 06 2002 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $50,899 $6,720 Implemented
IC0036 # 07 Y:2002 07 2002 RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR $14,346 $7,100 Not Implemented
IC0036 # 08 Y:2002 08 2002 AUTOMATE PAYROLL SYSTEM $54,800 $9,262 Implemented
IC0036 # 09 Y:2002 09 2002 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $33,746 $19,500 Not Implemented
UU0022 # 01 Y:2002 01 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $17,290 $53,909 Not Implemented
UU0022 # 02 Y:2002 02 2002 OPTIMIZE PLANT POWER FACTOR $5,007 $7,160 Implemented
UU0022 # 03 Y:2002 03 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $3,373 $365 Implemented
UU0022 # 04 Y:2002 04 2002 INSTALL SKYLIGHTS $21,234 $34,000 Not Implemented
UU0022 # 05 Y:2002 05 2002 UPGRADE OBSOLETE EQUIPMENT $18,175 $80,000 Not Implemented
UU0022 # 06 Y:2002 06 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,022 $326 Implemented
UU0022 # 07 Y:2002 07 2002 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $32,358 $17,100 Implemented
NC0235 # 01 Y:2002 01 2002 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $17,277 $100 Implemented
NC0235 # 02 Y:2002 02 2002 INSTALL BACK-UP EQUIPMENT $156,500 $1,000 Not Implemented
NC0235 # 03 Y:2002 03 2002 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $12,464 $550 Not Implemented
NC0235 # 04 Y:2002 04 2002 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $30,410 $1,000 Implemented
NC0235 # 05 Y:2002 05 2002 DEVELOP A REPAIR/REPLACE POLICY $23,267 $15,570 Implemented
NC0235 # 06 Y:2002 06 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,171 $2,434 Implemented
NC0235 # 07 Y:2002 07 2002 RECOVER AND REUSE COOLING WATER $213 $500 Not Implemented
SD0295 # 01 Y:2002 01 2002 USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE $9,645 $200 Not Implemented
SD0295 # 02 Y:2002 02 2002 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $3,840 $0 Not Implemented
SD0295 # 03 Y:2002 03 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $26,967 $0 Not Implemented
SD0295 # 04 Y:2002 04 2002 USE PHOTOCELL CONTROLS $1,578 $1,000 Implemented
SD0295 # 05 Y:2002 05 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $1,373 $3,000 Not Implemented