IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,708

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0295 # 06 Y:2002 06 2002 INSTALL SKYLIGHTS $543 $1,200 Not Implemented
SD0295 # 07 Y:2002 07 2002 RECOVER AND REUSE WASTE MATERIAL $198,000 $15,000 Not Implemented
SD0295 # 08 Y:2002 08 2002 INSTALL AUTOMATIC PACKING EQUIPMENT $416,352 $655,000 Implemented
SD0295 # 09 Y:2002 09 2002 INSTALL AUTOMATIC PACKING EQUIPMENT $5,965 $3,500 Not Implemented
OK0641 # 01 Y:2002 01 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $49,032 $32,834 n/a
OK0641 # 02 Y:2002 02 2002 INSTALL SET-BACK TIMERS $1,658 $238 Not Implemented
OK0641 # 03 Y:2002 03 2002 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $36,000 $64,800 n/a
OK0641 # 04 Y:2002 04 2002 OPTIMIZE PLANT POWER FACTOR $2,661 $8,000 n/a
OK0641 # 05 Y:2002 05 2002 INSTALL OCCUPANCY SENSORS $265 $350 Not Implemented
OK0641 # 06 Y:2002 06 2002 REPLACE DC EQUIPMENT WITH AC EQUIPMENT $47,600 $71,935 n/a
OK0641 # 07 Y:2002 07 2002 USE OPTIMUM THICKNESS INSULATION $194,258 $42,750 Implemented
NC0232 # 01 Y:2002 01 2002 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $13,002 $800 Implemented
NC0232 # 02 Y:2002 02 2002 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $12,335 $15,000 Not Implemented
NC0232 # 03 Y:2002 03 2002 DEVELOP A REPAIR/REPLACE POLICY $1,645 $1,818 Implemented
NC0232 # 04 Y:2002 04 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $561 $248 Implemented
NC0232 # 05 Y:2002 05 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $740 $150 Implemented
NC0232 # 06 Y:2002 06 2002 KEEP BOILER TUBES CLEAN $596 $1,100 Not Implemented
NC0232 # 07 Y:2002 07 2002 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $4,486 $850 Implemented
AS0324 # 01 Y:2002 01 2002 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $6,071 $1,750 Not Implemented
AS0324 # 02 Y:2002 02 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,718 $4,200 Not Implemented
AS0324 # 03 Y:2002 03 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,806 $9,004 Implemented
AS0324 # 04 Y:2002 04 2002 INSTALL OCCUPANCY SENSORS $444 $1,400 Not Implemented
AS0324 # 05 Y:2002 05 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $8,673 $0 Implemented
AS0324 # 06 Y:2002 06 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,714 $120 Not Implemented
AS0324 # 07 Y:2002 07 2002 INSTALL SKYLIGHTS $5,831 $6,702 Not Implemented