Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,002
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MZ0081 # 02 Y:2012 | 02 | 2012 | INSULATE BARE EQUIPMENT | $4,444 | $4,000 | Implemented |
MZ0081 # 03 Y:2012 | 03 | 2012 | INSULATE BARE EQUIPMENT | $9,628 | $8,667 | Implemented |
MZ0081 # 04 Y:2012 | 04 | 2012 | INSULATE BARE EQUIPMENT | $11,110 | $9,100 | Implemented |
MZ0081 # 05 Y:2012 | 05 | 2012 | USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR | $58,850 | $120,000 | Implemented |
MZ0081 # 06 Y:2012 | 06 | 2012 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,137 | $1,700 | Implemented |
MZ0081 # 07 Y:2012 | 07 | 2012 | TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY | $0 | $0 | Implemented |
MZ0088 # 01 Y:2012 | 01 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $532 | $800 | Not Implemented |
MZ0088 # 02 Y:2012 | 02 | 2012 | USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE | $1,179 | $11,250 | Not Implemented |
MZ0088 # 03 Y:2012 | 03 | 2012 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,833 | $0 | Not Implemented |
MZ0088 # 04 Y:2012 | 04 | 2012 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,252 | $2,400 | Not Implemented |
MZ0088 # 05 Y:2012 | 05 | 2012 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $698 | $1,200 | Not Implemented |
UMS008 # 01 Y:2012 | 01 | 2012 | RECOVER WASTE HEAT FROM EQUIPMENT | $265,000 | $400,000 | Implemented |
SF0414 # 01 Y:2012 | 01 | 2012 | TURN OFF EQUIPMENT WHEN NOT IN USE | $6,448 | $0 | Not Implemented |
SF0414 # 02 Y:2012 | 02 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $923 | $0 | Implemented |
SF0414 # 03 Y:2012 | 03 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $915 | $0 | Implemented |
SF0414 # 04 Y:2012 | 04 | 2012 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $1,223 | $382 | Not Implemented |
SF0414 # 05 Y:2012 | 05 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $25,314 | $38,630 | Not Implemented |
SF0414 # 06 Y:2012 | 06 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $85,494 | $200,504 | Not Implemented |
SF0414 # 07 Y:2012 | 07 | 2012 | INSTALL OCCUPANCY SENSORS | $39,049 | $165,422 | Not Implemented |
SF0414 # 08 Y:2012 | 08 | 2012 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $5,081 | $36,975 | Not Implemented |
SF0414 # 09 Y:2012 | 09 | 2012 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $129,890 | $2,875,288 | Implemented |
NC0451 # 01 Y:2012 | 01 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,790 | $14,320 | Implemented |
NC0451 # 02 Y:2012 | 02 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $444 | $1,674 | Implemented |
NC0451 # 03 Y:2012 | 03 | 2012 | INSTALL OCCUPANCY SENSORS | $252 | $533 | Implemented |
NC0451 # 04 Y:2012 | 04 | 2012 | MINIMIZE CONDENSER COOLING WATER TEMPERATURE | $2,656 | $1,800 | Not Implemented |