IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,002

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MZ0081 # 02 Y:2012 02 2012 INSULATE BARE EQUIPMENT $4,444 $4,000 Implemented
MZ0081 # 03 Y:2012 03 2012 INSULATE BARE EQUIPMENT $9,628 $8,667 Implemented
MZ0081 # 04 Y:2012 04 2012 INSULATE BARE EQUIPMENT $11,110 $9,100 Implemented
MZ0081 # 05 Y:2012 05 2012 USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR $58,850 $120,000 Implemented
MZ0081 # 06 Y:2012 06 2012 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,137 $1,700 Implemented
MZ0081 # 07 Y:2012 07 2012 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $0 $0 Implemented
MZ0088 # 01 Y:2012 01 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $532 $800 Not Implemented
MZ0088 # 02 Y:2012 02 2012 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $1,179 $11,250 Not Implemented
MZ0088 # 03 Y:2012 03 2012 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,833 $0 Not Implemented
MZ0088 # 04 Y:2012 04 2012 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,252 $2,400 Not Implemented
SF0414 # 01 Y:2012 01 2012 TURN OFF EQUIPMENT WHEN NOT IN USE $6,448 $0 Not Implemented
SF0414 # 02 Y:2012 02 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $923 $0 Implemented
SF0414 # 03 Y:2012 03 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $915 $0 Implemented
SF0414 # 04 Y:2012 04 2012 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,223 $382 Not Implemented
SF0414 # 05 Y:2012 05 2012 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $25,314 $38,630 Not Implemented
SF0414 # 06 Y:2012 06 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $85,494 $200,504 Not Implemented
SF0414 # 07 Y:2012 07 2012 INSTALL OCCUPANCY SENSORS $39,049 $165,422 Not Implemented
SF0414 # 08 Y:2012 08 2012 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $5,081 $36,975 Not Implemented
SF0414 # 09 Y:2012 09 2012 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $129,890 $2,875,288 Implemented
MZ0088 # 05 Y:2012 05 2012 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $698 $1,200 Not Implemented
UMS008 # 01 Y:2012 01 2012 RECOVER WASTE HEAT FROM EQUIPMENT $265,000 $400,000 Implemented
NC0451 # 01 Y:2012 01 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $5,790 $14,320 Implemented
NC0451 # 02 Y:2012 02 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $444 $1,674 Implemented
NC0451 # 03 Y:2012 03 2012 INSTALL OCCUPANCY SENSORS $252 $533 Implemented
NC0451 # 04 Y:2012 04 2012 MINIMIZE CONDENSER COOLING WATER TEMPERATURE $2,656 $1,800 Not Implemented