Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,597
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TT0192 # 06 Y:2017 | 06 | 2017 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $7,000 | $20,000 | Not Implemented |
TT0192 # 07 Y:2017 | 07 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,001 | $3,000 | Not Implemented |
TT0192 # 08 Y:2017 | 08 | 2017 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $3,741 | $8,000 | Not Implemented |
TT0192 # 09 Y:2017 | 09 | 2017 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $2,309 | $10,000 | Not Implemented |
TT0192 # 10 Y:2017 | 10 | 2017 | DEVELOP A REPAIR/REPLACE POLICY | $796 | $1,453 | Not Implemented |
SF0500 # 01 Y:2017 | 01 | 2017 | INSTALL / REPAIR INSULATION ON STEAM LINES | $161 | $294 | Implemented |
SF0500 # 02 Y:2017 | 02 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,814 | $7,558 | Implemented |
SF0500 # 03 Y:2017 | 03 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $760 | $2,070 | Not Implemented |
SF0500 # 04 Y:2017 | 04 | 2017 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $7,463 | $0 | Not Implemented |
SF0500 # 05 Y:2017 | 05 | 2017 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $3,907 | $0 | Implemented |
SF0500 # 06 Y:2017 | 06 | 2017 | USE SOLAR HEAT TO MAKE ELECTRICTY | $80,824 | $383,827 | Not Implemented |
WV0542 # 01 Y:2017 | 01 | 2017 | USE EVAPORATION TO CONCENTRATE MATERIAL | $9,150 | $45,000 | Not Implemented |
WV0542 # 02 Y:2017 | 02 | 2017 | INSTALL OCCUPANCY SENSORS | $5,206 | $5,330 | Implemented |
WV0542 # 03 Y:2017 | 03 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,056 | $765 | Implemented |
WV0542 # 04 Y:2017 | 04 | 2017 | INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION | $4,841 | $16,500 | Not Implemented |
WV0542 # 05 Y:2017 | 05 | 2017 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $4,681 | $2,700 | Implemented |
WV0542 # 06 Y:2017 | 06 | 2017 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,665 | $0 | Implemented |
WV0542 # 07 Y:2017 | 07 | 2017 | REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT | $3,828 | $1,800 | Not Implemented |
WV0542 # 08 Y:2017 | 08 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,984 | $9,625 | Implemented |
WV0542 # 09 Y:2017 | 09 | 2017 | MINIMIZE WATER USAGE | $2,251 | $7,000 | Implemented |
WV0542 # 10 Y:2017 | 10 | 2017 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $1,131 | $883 | Implemented |
WV0542 # 11 Y:2017 | 11 | 2017 | DEVELOP A REPAIR/REPLACE POLICY | $963 | $940 | Implemented |
WV0542 # 12 Y:2017 | 12 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $955 | $2,135 | Implemented |
WV0542 # 13 Y:2017 | 13 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $926 | $100 | Implemented |
WV0542 # 14 Y:2017 | 14 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $881 | $2,150 | Not Implemented |