IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,130

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
UD0417 # 01 Y:1993 01 1993 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $5,791 $0 Not Implemented
UD0417 # 02 Y:1993 02 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $191 $937 Not Implemented
UD0417 # 03 Y:1993 03 1993 USE DEMAND CONTROLLER OR LOAD SHEDDER $57,131 $250 Not Implemented
AS0104 # 01 Y:1993 01 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,027 $0 Not Implemented
AS0104 # 02 Y:1993 02 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,926 $3,600 Not Implemented
AS0104 # 03 Y:1993 03 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $580 $369 Not Implemented
AS0104 # 04 Y:1993 04 1993 INSTALL OCCUPANCY SENSORS $1,134 $1,021 Not Implemented
AS0104 # 05 Y:1993 05 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $9,642 $0 Not Implemented
AS0104 # 06 Y:1993 06 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,448 $7,084 Not Implemented
AS0104 # 07 Y:1993 07 1993 USE FOSSIL FUEL POWERED GENERATOR DURING PEAK DEMAND PERIODS $382,023 $1,218,600 Not Implemented
MO0105 # 01 Y:1993 01 1993 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $67,868 $8,774 Not Implemented
MO0105 # 02 Y:1993 02 1993 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $5,635 $100 Implemented
MO0105 # 03 Y:1993 03 1993 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $204 $0 Implemented
MO0105 # 04 Y:1993 04 1993 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $43,359 $7,325 Not Implemented
MO0105 # 05 Y:1993 05 1993 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $515 $1,024 Implemented
MO0105 # 06 Y:1993 06 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $9,317 $31,982 Implemented
MO0105 # 07 Y:1993 07 1993 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,548 $1,125 Implemented
MO0105 # 08 Y:1993 08 1993 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,346 $777 Implemented
MO0105 # 09 Y:1993 09 1993 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $907 $554 Implemented
MO0105 # 10 Y:1993 10 1993 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $334 $20 Implemented
MO0104 # 01 Y:1993 01 1993 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $9,658 $1,695 Implemented
MO0104 # 02 Y:1993 02 1993 INSTALL / REPAIR INSULATION ON STEAM LINES $8,592 $13,864 Implemented
MO0104 # 03 Y:1993 03 1993 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $13,920 $9,730 Implemented
MO0104 # 04 Y:1993 04 1993 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $4,718 $704 Not Implemented
MO0104 # 05 Y:1993 05 1993 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $4,026 $12,064 Implemented