IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,260

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OR0524 # 03 Y:2007 03 2007 UPGRADE CONTROLS ON COMPRESSORS $13,700 $35,000 Implemented
OR0524 # 04 Y:2007 04 2007 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,100 $0 Implemented
OR0524 # 05 Y:2007 05 2007 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,000 $0 Not Implemented
OR0524 # 06 Y:2007 06 2007 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,800 $1,300 Not Implemented
OR0524 # 07 Y:2007 07 2007 OPTIMIZE PLANT POWER FACTOR $13,800 $19,200 Not Implemented
MA0625 # 01 Y:2007 01 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $17,463 $31,000 Not Implemented
MA0625 # 02 Y:2007 02 2007 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $8,935 $8,000 Implemented
MA0625 # 03 Y:2007 03 2007 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $7,861 $14,400 Not Implemented
MA0625 # 04 Y:2007 04 2007 TURN OFF EQUIPMENT WHEN NOT IN USE $5,881 $0 Not Implemented
MA0625 # 05 Y:2007 05 2007 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $3,964 $10,530 Implemented
OR0523 # 01 Y:2007 01 2007 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $35,000 $60,000 Implemented
OR0523 # 02 Y:2007 02 2007 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $77,000 $5,000 Not Implemented
OR0523 # 03 Y:2007 03 2007 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $1,350,000 $32,700 Not Implemented
OR0523 # 04 Y:2007 04 2007 INSULATE BARE EQUIPMENT $1,220 $1,160 Implemented
OR0523 # 05 Y:2007 05 2007 COVER OPEN TANKS $3,000 $9,000 Not Implemented
MA0624 # 01 Y:2007 01 2007 REPAIR OR REPLACE STEAM TRAPS $62,300 $24,500 Implemented
MA0624 # 02 Y:2007 02 2007 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $47,607 $22,000 Not Implemented
MA0624 # 03 Y:2007 03 2007 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $24,012 $50,000 Implemented
MA0624 # 04 Y:2007 04 2007 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $14,298 $11,500 Implemented
MA0624 # 05 Y:2007 05 2007 IMPROVE COMBUSTION CONTROL CAPABILITY $12,255 $75,000 Implemented
MA0624 # 06 Y:2007 06 2007 USE DEMAND CONTROLLER OR LOAD SHEDDER $11,448 $2,500 Implemented
MA0624 # 07 Y:2007 07 2007 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,741 $0 Implemented
MA0624 # 08 Y:2007 08 2007 RECOVER WASTE HEAT FROM EQUIPMENT $4,655 $4,000 Implemented
MA0624 # 09 Y:2007 09 2007 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $4,605 $1,000 Not Implemented
MA0624 # 10 Y:2007 10 2007 TURN OFF EQUIPMENT WHEN NOT IN USE $4,007 $12,000 Implemented