IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,304

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0199 # 04 Y:2010 04 2010 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $10,308 $7,450 Implemented
MI0199 # 05 Y:2010 05 2010 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $9,954 $2,200 Implemented
MI0199 # 06 Y:2010 06 2010 INSULATE BARE EQUIPMENT $8,626 $1,786 Not Implemented
MI0199 # 07 Y:2010 07 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $7,254 $5,975 Implemented
MI0199 # 08 Y:2010 08 2010 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $4,552 $4,531 Implemented
AM0585 # 01 Y:2010 01 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $11,400 $20,200 Not Implemented
AM0585 # 02 Y:2010 02 2010 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $9,140 $0 Not Implemented
AM0585 # 03 Y:2010 03 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,290 $600 Not Implemented
AM0585 # 04 Y:2010 04 2010 OPTIMIZE PLANT POWER FACTOR $4,500 $10,480 Not Implemented
AM0585 # 05 Y:2010 05 2010 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $1,950 $270 Not Implemented
AM0585 # 06 Y:2010 06 2010 USE SYNTHETIC LUBRICANT $820 $0 Not Implemented
AM0585 # 07 Y:2010 07 2010 TURN OFF EQUIPMENT WHEN NOT IN USE $105 $0 Not Implemented
MI0198 # 01 Y:2010 01 2010 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $39,683 $55,919 Implemented
MI0198 # 02 Y:2010 02 2010 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $37,497 $39,695 Not Implemented
MI0198 # 03 Y:2010 03 2010 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $17,892 $2,000 Implemented
MI0198 # 04 Y:2010 04 2010 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $8,048 $13,338 Implemented
MI0198 # 05 Y:2010 05 2010 INSTALL OCCUPANCY SENSORS $5,576 $14,400 Implemented
MI0198 # 06 Y:2010 06 2010 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,870 $1,210 Implemented
MI0198 # 07 Y:2010 07 2010 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $3,644 $11,985 Not Implemented
MI0198 # 08 Y:2010 08 2010 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,407 $40 Implemented
LE0308 # 01 Y:2010 01 2010 INSTALL TIMERS AND/OR THERMOSTATS $21,676 $250 Implemented
LE0308 # 02 Y:2010 02 2010 REPLACE BOILER $18,600 $210,000 Implemented
LE0308 # 03 Y:2010 03 2010 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $10,731 $12,600 Not Implemented
LE0308 # 04 Y:2010 04 2010 PREHEAT COMBUSTION AIR WITH WASTE HEAT $8,965 $25,000 Not Implemented
LE0308 # 05 Y:2010 05 2010 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $7,842 $6,180 Implemented