Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,703
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
AM0668 # 04 Y:2014 | 04 | 2014 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,820 | $9 | Not Implemented |
AM0668 # 05 Y:2014 | 05 | 2014 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $1,110 | $0 | Implemented |
AM0668 # 06 Y:2014 | 06 | 2014 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $450 | $60 | Not Implemented |
AM0669 # 01 Y:2014 | 01 | 2014 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $24,407 | $52 | Implemented |
AM0669 # 02 Y:2014 | 02 | 2014 | METER WASTE WATER | $20,590 | $4,500 | Implemented |
AM0669 # 03 Y:2014 | 03 | 2014 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $10,410 | $0 | Implemented |
AM0669 # 04 Y:2014 | 04 | 2014 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $6,332 | $3,600 | Implemented |
AM0669 # 05 Y:2014 | 05 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,663 | $12,000 | Implemented |
AM0669 # 06 Y:2014 | 06 | 2014 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $4,800 | $315 | Not Implemented |
AM0669 # 07 Y:2014 | 07 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,186 | $570 | Implemented |
AM0669 # 08 Y:2014 | 08 | 2014 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $950 | $44 | Implemented |
UA0130 # 01 Y:2014 | 01 | 2014 | USE RADIANT HEATER FOR SPOT HEATING | $15,715 | $35,154 | Not Implemented |
UA0130 # 02 Y:2014 | 02 | 2014 | RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING | $11,506 | $6,410 | Not Implemented |
UA0130 # 03 Y:2014 | 03 | 2014 | INSTALL TIMERS AND/OR THERMOSTATS | $2,774 | $200 | Implemented |
UA0130 # 04 Y:2014 | 04 | 2014 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $1,266 | $0 | Implemented |
UA0130 # 05 Y:2014 | 05 | 2014 | INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS | $6,867 | $4,120 | Not Implemented |
UA0130 # 06 Y:2014 | 06 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,986 | $2,522 | Not Implemented |
UA0130 # 07 Y:2014 | 07 | 2014 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,890 | $100 | Implemented |
IP0030 # 01 Y:2014 | 01 | 2014 | INSTALL SET-BACK TIMERS | $4,377 | $35 | Implemented |
IP0030 # 02 Y:2014 | 02 | 2014 | ISOLATE STEAM LINES TO AVOID HEATING AIR CONDITIONED AREAS | $5,730 | $124 | Implemented |
IP0030 # 03 Y:2014 | 03 | 2014 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,493 | $280 | Implemented |
IP0030 # 04 Y:2014 | 04 | 2014 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $6,369 | $746 | Not Implemented |
IP0030 # 05 Y:2014 | 05 | 2014 | INSTALL OCCUPANCY SENSORS | $442 | $227 | Implemented |
IP0030 # 06 Y:2014 | 06 | 2014 | INSULATE BARE EQUIPMENT | $685 | $380 | Not Implemented |
IP0030 # 07 Y:2014 | 07 | 2014 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,951 | $1,300 | Not Implemented |