Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,597
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UU0124 # 01 Y:2017 | 01 | 2017 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $12,503 | $0 | Implemented |
UU0124 # 02 Y:2017 | 02 | 2017 | OPTIMIZE PLANT POWER FACTOR | $5,444 | $5,000 | Implemented |
UU0124 # 03 Y:2017 | 03 | 2017 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $4,630 | $3,140 | Not Implemented |
UU0124 # 04 Y:2017 | 04 | 2017 | REDUCE HEAT GAIN BY WINDOW TINTING | $3,392 | $10,800 | Not Implemented |
UU0124 # 05 Y:2017 | 05 | 2017 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $1,833 | $4,266 | Not Implemented |
UU0124 # 06 Y:2017 | 06 | 2017 | TURN OFF EQUIPMENT WHEN NOT IN USE | $980 | $0 | Implemented |
UU0124 # 07 Y:2017 | 07 | 2017 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $854 | $1,702 | Implemented |
UU0124 # 08 Y:2017 | 08 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $681 | $1,463 | Implemented |
UU0124 # 09 Y:2017 | 09 | 2017 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $386 | $0 | Implemented |
WM0114 # 01 Y:2017 | 01 | 2017 | MAINTAIN MACHINES TO REDUCE LEAKS | $16,398 | $20,000 | Implemented |
WM0114 # 02 Y:2017 | 02 | 2017 | USE SOLAR HEAT TO HEAT MAKE-UP AIR | $13,132 | $72,000 | Not Implemented |
WM0114 # 03 Y:2017 | 03 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,735 | $23,350 | Not Implemented |
WM0114 # 04 Y:2017 | 04 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $5,449 | $332 | Implemented |
WM0114 # 05 Y:2017 | 05 | 2017 | USE RADIANT HEATER FOR SPOT HEATING | $4,330 | $1,815 | Implemented |
WM0114 # 06 Y:2017 | 06 | 2017 | INSTALL OCCUPANCY SENSORS | $3,167 | $1,660 | Not Implemented |
WM0114 # 07 Y:2017 | 07 | 2017 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,956 | $0 | Implemented |
WM0114 # 08 Y:2017 | 08 | 2017 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,082 | $3,200 | Implemented |
WM0114 # 09 Y:2017 | 09 | 2017 | USE PHOTOCELL CONTROLS | $615 | $73 | Not Implemented |
UD0978 # 01 Y:2017 | 01 | 2017 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $7,058 | $0 | Not Implemented |
UD0978 # 02 Y:2017 | 02 | 2017 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,107 | $1,000 | Not Implemented |
UD0978 # 03 Y:2017 | 03 | 2017 | REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES | $1,562 | $1,000 | Not Implemented |
UD0978 # 04 Y:2017 | 04 | 2017 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $79,415 | $79,850 | Not Implemented |
UD0978 # 05 Y:2017 | 05 | 2017 | ADD AREA LIGHTING SWITCHES | $2,220 | $180 | Not Implemented |
UD0978 # 06 Y:2017 | 06 | 2017 | USE OPTIMUM THICKNESS INSULATION | $86,982 | $91,480 | Not Implemented |
UD0978 # 07 Y:2017 | 07 | 2017 | MINIMIZE NON-ESSENTIAL MATERIAL IN HEAT TREATMENT PROCESS | $37,937 | $100,000 | Not Implemented |