IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

164,740

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
LS0225 # 01 Y:2025 01 2025 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $4,695 $0 n/a
LS0225 # 02 Y:2025 02 2025 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,607 $2,927 n/a
LS0225 # 03 Y:2025 03 2025 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $3,877 $29,510 n/a
LS0225 # 04 Y:2025 04 2025 USE SOLAR HEAT TO MAKE ELECTRICTY $38,911 $514,800 n/a
WM0230 # 01 Y:2025 01 2025 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $155,302 $120,000 n/a
WM0230 # 02 Y:2025 02 2025 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $2,743 $4,500 n/a
WM0230 # 03 Y:2025 03 2025 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $1,667 $900 n/a
WM0230 # 04 Y:2025 04 2025 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,358 $2,488 n/a
LS2502 # 01 Y:2025 01 2025 CLEAN AND MAINTAIN REFRIGERANT CONDENSERS AND TOWERS $8,066 $0 Implemented
LS2502 # 02 Y:2025 02 2025 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,792 $100 Not Implemented
LS2502 # 03 Y:2025 03 2025 INSTALL OCCUPANCY SENSORS $6,307 $300 Implemented
LS2502 # 04 Y:2025 04 2025 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $905 $45 Implemented
LS2502 # 05 Y:2025 05 2025 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,783 $6,965 Implemented
MI0452 # 01 Y:2024 01 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,470 $860 Not Implemented
MI0452 # 02 Y:2024 02 2024 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,989 $960 Not Implemented
MI0452 # 03 Y:2024 03 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,550 $1,660 Not Implemented
MI0452 # 04 Y:2024 04 2024 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $6,049 $4,092 Not Implemented
MI0452 # 05 Y:2024 05 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,650 $23,081 Not Implemented
MI0452 # 06 Y:2024 06 2024 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $14,517 $21,120 Not Implemented
MI0452 # 07 Y:2024 07 2024 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $2,069 $3,165 Not Implemented
MI0452 # 08 Y:2024 08 2024 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $5,068 $14,019 Not Implemented
MI0452 # 09 Y:2024 09 2024 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC $204 $590 Not Implemented
MI0452 # 10 Y:2024 10 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $53,529 $245,201 Not Implemented
SU0563 # 01 Y:2024 01 2024 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $6,490 $0 Implemented
SU0563 # 02 Y:2024 02 2024 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $14,283 $0 Not Implemented