IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,683

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
IC0040 # 18 Y:2002 18 2002 AUTOMATE PAYROLL SYSTEM $97,419 $9,377 Implemented
IC0040 # 19 Y:2002 19 2002 MODIFY WORKLOAD $63,986 $46,300 Not Implemented
IC0031 # 01 Y:2002 01 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $15,703 $10,800 Implemented
IC0031 # 02 Y:2002 02 2002 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,312 $3,338 Implemented
IC0031 # 03 Y:2002 03 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,544 $57,230 Not Implemented
IC0031 # 04 Y:2002 04 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $924 $12,002 Not Implemented
IC0031 # 05 Y:2002 05 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,264 $2,894 Implemented
IC0031 # 06 Y:2002 06 2002 USE DEMAND CONTROLLER OR LOAD SHEDDER $21,800 $3,080 Implemented
IC0031 # 07 Y:2002 07 2002 UTILIZE OUTSIDE AIR INSTEAD OF CONDITIONED AIR FOR DRYING $9,652 $16,500 Not Implemented
IC0031 # 08 Y:2002 08 2002 RECOVER WASTE HEAT FROM EQUIPMENT $36,439 $18,900 Not Implemented
IC0031 # 09 Y:2002 09 2002 RECOVER WASTE HEAT FROM EQUIPMENT $96,700 $195,000 Not Implemented
IC0031 # 10 Y:2002 10 2002 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $49,201 $45,000 Not Implemented
UD0610 # 01 Y:2001 01 2001 IMPROVE SPACE COMFORT CONDITIONING $101,536 $402,000 Implemented
UD0610 # 02 Y:2001 02 2001 USE LESS TOXIC AND VOLATILE SOLVENT SUBSTITUTES $95,666 $2,550 Not Implemented
UD0610 # 03 Y:2001 03 2001 USE FIXTURES TO REDUCE MACHINE CHANGEOUT TIMES $28,005 $12,000 Not Implemented
UD0610 # 04 Y:2001 04 2001 TURN OFF EQUIPMENT WHEN NOT IN USE $2,646 $1,500 Not Implemented
UD0610 # 05 Y:2001 05 2001 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $6,232 $0 Not Implemented
UD0610 # 06 Y:2001 06 2001 USE SEPARATE SWITCHES ON PERIMETER LIGHTING WHICH MAY BE TURNED OFF WHEN NATURAL LIGHT IS AVAILABLE $2,028 $0 Not Implemented
UD0610 # 07 Y:2001 07 2001 RECOVER WASTE HEAT FROM EQUIPMENT $1,984 $6,000 Implemented
UD0610 # 08 Y:2001 08 2001 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS $1,387 $500 Not Implemented
ND0365 # 01 Y:2000 01 2000 INCREASE EFFICIENCY OF TRUCKS $3,969 $28,000 Not Implemented
ND0365 # 02 Y:2000 02 2000 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $897 $120 Implemented
ND0365 # 03 Y:2000 03 2000 RECOVER WASTE HEAT FROM EQUIPMENT $883 $500 Not Implemented
ND0365 # 04 Y:2000 04 2000 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $430 $400 Not Implemented
ND0365 # 05 Y:2000 05 2000 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $271 $400 Not Implemented