IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,942

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0466 # 12 Y:2013 12 2013 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,001 $113 Implemented
WV0466 # 13 Y:2013 13 2013 DEVELOP A REPAIR/REPLACE POLICY $477 $470 Implemented
WV0465 # 01 Y:2013 01 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $36,796 $52,900 Implemented
WV0465 # 02 Y:2013 02 2013 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $22,591 $44,160 Implemented
WV0465 # 03 Y:2013 03 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,229 $16,800 Implemented
WV0465 # 04 Y:2013 04 2013 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $5,400 $6,350 Not Implemented
WV0465 # 05 Y:2013 05 2013 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $4,786 $1,000 Implemented
WV0465 # 06 Y:2013 06 2013 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $1,638 $1,083 Not Implemented
WV0465 # 07 Y:2013 07 2013 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,174 $3,762 Implemented
WV0465 # 08 Y:2013 08 2013 INSULATE BARE EQUIPMENT $1,171 $816 Implemented
WV0465 # 09 Y:2013 09 2013 DEVELOP A REPAIR/REPLACE POLICY $174 $415 Implemented
WV0465 # 10 Y:2013 10 2013 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $155 $90 Implemented
UD0876 # 01 Y:2013 01 2013 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $25,570 $0 Implemented
UD0876 # 02 Y:2013 02 2013 OPTIMIZE PLANT POWER FACTOR $3,308 $12,000 Not Implemented
UD0876 # 03 Y:2013 03 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $2,184 $0 Implemented
UD0876 # 04 Y:2013 04 2013 BASE UTILITY CHARGES ON USAGE RATHER THAN AREA OCCUPIED $1,416 $1,400 Implemented
UD0876 # 05 Y:2013 05 2013 INSTALL OCCUPANCY SENSORS $5,943 $6,500 Implemented
UD0876 # 06 Y:2013 06 2013 TURN OFF EQUIPMENT WHEN NOT IN USE $1,557 $0 Implemented
UD0876 # 07 Y:2013 07 2013 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $630 $0 Implemented
UD0876 # 08 Y:2013 08 2013 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,009 $14,325 Not Implemented
UD0876 # 09 Y:2013 09 2013 REDUCE WATER USE WITH COUNTER CURRENT RINSING $1,245 $1,000 Not Implemented
UD0876 # 10 Y:2013 10 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $706 $1,000 Implemented
UD0876 # 11 Y:2013 11 2013 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $489 $50 Not Implemented
UD0876 # 12 Y:2013 12 2013 USE RADIANT HEATER FOR SPOT HEATING $10,039 $15,000 Implemented
UD0876 # 13 Y:2013 13 2013 AIR CONDITION ONLY SPACE NECESSARY $1,344 $0 Implemented