IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,059

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0408 # 02 Y:2001 02 2001 MINIMIZE WATER USAGE $29,411 $2,200 n/a
WI0408 # 03 Y:2001 03 2001 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $23,329 $31,000 n/a
WI0408 # 04 Y:2001 04 2001 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $20,025 $0 n/a
WI0408 # 05 Y:2001 05 2001 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $14,442 $6,917 n/a
WI0408 # 06 Y:2001 06 2001 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $11,596 $12,000 n/a
WI0408 # 07 Y:2001 07 2001 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $3,941 $11,250 n/a
WI0408 # 08 Y:2001 08 2001 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $1,476 $6,957 n/a
WI0409 # 01 Y:2001 01 2001 INSTALL SOLID WASTE INCINERATOR FOR HEAT $34,371 $130,000 Not Implemented
WI0409 # 02 Y:2001 02 2001 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $32,500 $0 Not Implemented
WI0409 # 03 Y:2001 03 2001 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $7,602 $0 Not Implemented
WI0409 # 04 Y:2001 04 2001 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $5,314 $4,600 Not Implemented
WI0409 # 05 Y:2001 05 2001 TURN OFF EQUIPMENT WHEN NOT IN USE $3,301 $0 Not Implemented
WI0409 # 06 Y:2001 06 2001 TURN OFF EQUIPMENT WHEN NOT IN USE $3,015 $0 Not Implemented
WI0409 # 07 Y:2001 07 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,037 $5,758 Not Implemented
WI0409 # 08 Y:2001 08 2001 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $1,668 $0 Not Implemented
WI0409 # 09 Y:2001 09 2001 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,108 $1,028 Not Implemented
WI0409 # 10 Y:2001 10 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $808 $0 Not Implemented
WI0409 # 11 Y:2001 11 2001 INSTALL OCCUPANCY SENSORS $552 $200 Not Implemented
WI0407 # 01 Y:2001 01 2001 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $26,600 $0 n/a
WI0407 # 02 Y:2001 02 2001 DISTILL CONTAMINATED SOLVENTS FOR REUSE $6,632 $12,000 n/a
WI0407 # 03 Y:2001 03 2001 TURN OFF EQUIPMENT WHEN NOT IN USE $4,562 $100 n/a
WI0407 # 04 Y:2001 04 2001 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $3,796 $3,760 n/a
WI0407 # 05 Y:2001 05 2001 INSTALL TIMERS AND/OR THERMOSTATS $4,274 $600 n/a
WI0407 # 06 Y:2001 06 2001 REPLACE CLOTH RAGS WITH PAPER TOWELS $751 $0 n/a
WI0407 # 07 Y:2001 07 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $486 $640 n/a