IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,474

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
NV0005 # 04 Y:1994 04 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $848 $300 Implemented
OD0004 # 01 Y:1994 01 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,341 $800 Implemented
OD0004 # 02 Y:1994 02 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,431 $11,417 Implemented
OD0004 # 03 Y:1994 03 1994 INSTALL TIMERS AND/OR THERMOSTATS $2,461 $780 Not Implemented
OD0004 # 04 Y:1994 04 1994 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $424 $548 Not Implemented
SD0090 # 01 Y:1994 01 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $6,797 $7,970 Implemented
SD0090 # 02 Y:1994 02 1994 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $11,493 $4,560 Not Implemented
SD0090 # 03 Y:1994 03 1994 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $3,889 $1,660 Not Implemented
SD0090 # 04 Y:1994 04 1994 MODIFY REFRIGERATION SYSTEM TO OPERATE AT A LOWER PRESSURE $2,631 $386 Not Implemented
SD0090 # 05 Y:1994 05 1994 INSULATE BARE EQUIPMENT $4,870 $265 Not Implemented
SD0090 # 06 Y:1994 06 1994 USE POWER DURING OFF-PEAK PERIODS $7,823 $0 Not Implemented
SD0090 # 07 Y:1994 07 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,132 $13,324 Implemented
SD0090 # 08 Y:1994 08 1994 INSTALL SPECTRAL REFLECTORS / DELAMP $2,188 $2,670 Not Implemented
SD0090 # 09 Y:1994 09 1994 INSTALL OCCUPANCY SENSORS $877 $920 Not Implemented
SD0090 # 10 Y:1994 10 1994 INSTALL TIMERS AND/OR THERMOSTATS $3,048 $300 Not Implemented
OR0209 # 01 Y:1994 01 1994 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $732 $750 Not Implemented
OR0209 # 02 Y:1994 02 1994 IMPROVE COMBUSTION CONTROL CAPABILITY $27,860 $12,000 Implemented
OR0209 # 03 Y:1994 03 1994 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $274 $0 Implemented
OR0209 # 04 Y:1994 04 1994 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $2,640 $2,670 Implemented
OR0209 # 05 Y:1994 05 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $185 $248 Implemented
OR0209 # 06 Y:1994 06 1994 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $67,700 $260,000 Implemented
WV0036 # 01 Y:1994 01 1994 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $641 $10,433 Implemented
WV0036 # 02 Y:1994 02 1994 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $298 $7,270 Implemented
WV0036 # 03 Y:1994 03 1994 INSULATE BARE EQUIPMENT $8,461 $2,598 Not Implemented
WV0036 # 04 Y:1994 04 1994 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $41,062 $5,000 Not Implemented