IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,708

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0324 # 08 Y:2002 08 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $464 $230 Not Implemented
AS0324 # 09 Y:2002 09 2002 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $77,357 $15,800 Not Implemented
AS0324 # 10 Y:2002 10 2002 CLEAR AND RENT EXISTING SPACE $53,920 $5,308 Not Implemented
CO0503 # 01 Y:2002 01 2002 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM $51,590 $6,250 Implemented
CO0503 # 02 Y:2002 02 2002 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $25,940 $0 Implemented
CO0503 # 03 Y:2002 03 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,053 $0 Not Implemented
CO0503 # 04 Y:2002 04 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,310 $430 Implemented
CO0503 # 05 Y:2002 05 2002 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $3,730 $870 Not Implemented
CO0503 # 06 Y:2002 06 2002 INSTALL OCCUPANCY SENSORS $2,760 $3,360 Not Implemented
CO0503 # 07 Y:2002 07 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $498 $946 Implemented
CO0503 # 08 Y:2002 08 2002 USE PHOTOCELL CONTROLS $2,160 $2,040 Not Implemented
GT0729 # 01 Y:2002 01 2002 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $563,200 $312,500 Not Implemented
GT0729 # 02 Y:2002 02 2002 PREHEAT COMBUSTION AIR WITH WASTE HEAT $74,140 $270,000 n/a
GT0729 # 03 Y:2002 03 2002 MINIMIZE NON-ESSENTIAL MATERIAL IN HEAT TREATMENT PROCESS $71,787 $13,892 n/a
GT0729 # 04 Y:2002 04 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,990 $1,450 Not Implemented
GT0729 # 05 Y:2002 05 2002 UPGRADE CONTROLS ON COMPRESSORS $60 $70 Not Implemented
GT0729 # 06 Y:2002 06 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,537 $10,872 Not Implemented
GT0729 # 07 Y:2002 07 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $693 $1,198 Not Implemented
GT0729 # 08 Y:2002 08 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $12,137 $162,293 Not Implemented
GT0729 # 09 Y:2002 09 2002 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $235,152 $156,000 Not Implemented
AS0323 # 01 Y:2002 01 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $23,932 $220 Implemented
AS0323 # 02 Y:2002 02 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,163 $3,020 Not Implemented
AS0323 # 03 Y:2002 03 2002 INSTALL OCCUPANCY SENSORS $276 $375 Not Implemented
AS0323 # 04 Y:2002 04 2002 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $6,114 $540 Not Implemented
AS0323 # 05 Y:2002 05 2002 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $633 $0 Implemented