IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,230

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0203 # 05 Y:2011 05 2011 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,157 $50 Implemented
MI0203 # 06 Y:2011 06 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,006 $1,320 Implemented
UD0831 # 01 Y:2011 01 2011 USE SOLAR HEAT TO MAKE ELECTRICTY $28,448 $196,170 Not Implemented
UD0831 # 02 Y:2011 02 2011 UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT $7,067 $25,796 Not Implemented
UD0831 # 03 Y:2011 03 2011 INSTALL SPECTRAL REFLECTORS / DELAMP $4,392 $3,863 Implemented
UD0831 # 04 Y:2011 04 2011 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $713 $10,495 Implemented
UD0831 # 05 Y:2011 05 2011 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,848 $12,100 Not Implemented
UD0831 # 06 Y:2011 06 2011 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $904 $1,167 Not Implemented
UD0831 # 07 Y:2011 07 2011 TURN OFF EQUIPMENT WHEN NOT IN USE $189 $240 Implemented
UD0831 # 08 Y:2011 08 2011 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS $137 $25 Implemented
LL0343 # 01 Y:2011 01 2011 REPAIR AND ELIMINATE STEAM LEAKS $106,373 $5,110 Implemented
LL0343 # 02 Y:2011 02 2011 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $81,368 $27,800 Implemented
LL0343 # 03 Y:2011 03 2011 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $16,390 $810 Not Implemented
LL0343 # 04 Y:2011 04 2011 INSULATE BARE EQUIPMENT $5,155 $2,526 Implemented
LL0343 # 05 Y:2011 05 2011 INSTALL SPECTRAL REFLECTORS / DELAMP $320 $455 Implemented
LL0343 # 06 Y:2011 06 2011 INSTALL OCCUPANCY SENSORS $368 $840 Not Implemented
LL0343 # 07 Y:2011 07 2011 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $363 $225 Implemented
LL0343 # 08 Y:2011 08 2011 CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES $259 $312 Not Implemented
WV0422 # 01 Y:2011 01 2011 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $29,044 $18,250 Not Implemented
WV0422 # 02 Y:2011 02 2011 CHANGE ZONE REHEAT COILS TO VARIABLE AIR VOLUME BOXES $9,494 $17,598 Not Implemented
WV0422 # 03 Y:2011 03 2011 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $4,167 $1,000 Implemented
WV0422 # 04 Y:2011 04 2011 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $3,049 $2,000 Implemented
WV0422 # 05 Y:2011 05 2011 DEVELOP A REPAIR/REPLACE POLICY $2,822 $1,150 Implemented
WV0422 # 06 Y:2011 06 2011 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,969 $920 Not Implemented
WV0422 # 07 Y:2011 07 2011 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $1,500 $2,875 Not Implemented