Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,002
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
NC0451 # 05 Y:2012 | 05 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,516 | $4,075 | Implemented |
NC0451 # 06 Y:2012 | 06 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $158 | $100 | Implemented |
TT0089 # 01 Y:2012 | 01 | 2012 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $4,022 | $6,293 | Not Implemented |
TT0089 # 02 Y:2012 | 02 | 2012 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $12,031 | $89,180 | Not Implemented |
TT0089 # 03 Y:2012 | 03 | 2012 | USE SOLAR HEAT FOR HEAT | $25,369 | $109,680 | Not Implemented |
TT0089 # 04 Y:2012 | 04 | 2012 | INSTALL SKYLIGHTS | $7,188 | $96,000 | Not Implemented |
UA0079 # 01 Y:2012 | 01 | 2012 | INSTALL DESICCANT HUMIDITY CONTROL SYSTEM | $57,749 | $240,000 | Not Implemented |
UA0079 # 02 Y:2012 | 02 | 2012 | RECOVER WASTE HEAT FROM EQUIPMENT | $6,836 | $1,500 | Not Implemented |
UA0079 # 03 Y:2012 | 03 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $5,031 | $6,195 | Not Implemented |
UA0079 # 04 Y:2012 | 04 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $3,119 | $480 | Implemented |
UA0079 # 05 Y:2012 | 05 | 2012 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $112 | $106 | Implemented |
LL0367 # 01 Y:2012 | 01 | 2012 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $3,603 | $540 | Not Implemented |
LL0367 # 02 Y:2012 | 02 | 2012 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $1,765 | $600 | Not Implemented |
LL0367 # 03 Y:2012 | 03 | 2012 | USE PHOTOCELL CONTROLS | $1,043 | $60 | Not Implemented |
LL0367 # 04 Y:2012 | 04 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $985 | $560 | Not Implemented |
LL0367 # 05 Y:2012 | 05 | 2012 | INSTALL OCCUPANCY SENSORS | $969 | $3,120 | Not Implemented |
LL0367 # 06 Y:2012 | 06 | 2012 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $720 | $570 | Not Implemented |
LL0367 # 07 Y:2012 | 07 | 2012 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $165 | $188 | Not Implemented |
NC0449 # 01 Y:2012 | 01 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $39,096 | $50,000 | Not Implemented |
NC0449 # 02 Y:2012 | 02 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $883 | $1,560 | Implemented |
NC0449 # 03 Y:2012 | 03 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,300 | $10,168 | Implemented |
NC0449 # 04 Y:2012 | 04 | 2012 | RECOVER WASTE HEAT FROM EQUIPMENT | $7,288 | $37,820 | Not Implemented |
NC0449 # 05 Y:2012 | 05 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,027 | $6,500 | Not Implemented |
NC0449 # 06 Y:2012 | 06 | 2012 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,521 | $3,200 | Not Implemented |
SD0449 # 01 Y:2012 | 01 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $4,392 | $100 | Implemented |