Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
12,007
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SF0458 # 04 Y:2014 | 04 | 2014 | INTERLOCK HEATING AND AIR CONDITIONING SYSTEMS TO PREVENT SIMULTANEOUS OPERATION | $1,582 | $522 | Implemented |
SF0458 # 05 Y:2014 | 05 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $15,813 | $30,411 | Not Implemented |
SF0458 # 06 Y:2014 | 06 | 2014 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $459 | $1,384 | Implemented |
SF0458 # 07 Y:2014 | 07 | 2014 | INSTALL OCCUPANCY SENSORS | $1,683 | $6,142 | Not Implemented |
SF0458 # 08 Y:2014 | 08 | 2014 | REUSE / RECYCLE/ SELL PAPER PRODUCTS | $3,900 | $0 | Implemented |
SF0458 # 09 Y:2014 | 09 | 2014 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $4,360 | $37,774 | Not Implemented |
SF0457 # 01 Y:2014 | 01 | 2014 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,158 | $180 | Not Implemented |
SF0457 # 02 Y:2014 | 02 | 2014 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $2,323 | $0 | Not Implemented |
SF0457 # 03 Y:2014 | 03 | 2014 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $10,640 | $4,356 | Not Implemented |
SF0457 # 04 Y:2014 | 04 | 2014 | INSTALL OCCUPANCY SENSORS | $4,973 | $3,386 | Implemented |
SF0457 # 05 Y:2014 | 05 | 2014 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $487 | $898 | Implemented |
SF0457 # 06 Y:2014 | 06 | 2014 | CONSERVE ENERGY BY EFFICIENT USE OF VENDING MACHINES | $270 | $597 | Not Implemented |
SF0457 # 07 Y:2014 | 07 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,420 | $21,352 | Implemented |
SF0457 # 08 Y:2014 | 08 | 2014 | USE SOLAR HEAT TO MAKE ELECTRICTY | $91,174 | $463,974 | Not Implemented |
SF0455 # 01 Y:2014 | 01 | 2014 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $26,214 | $210 | Implemented |
SF0455 # 02 Y:2014 | 02 | 2014 | REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS | $94,396 | $0 | Implemented |
SF0455 # 03 Y:2014 | 03 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $638 | $280 | Implemented |
SF0455 # 04 Y:2014 | 04 | 2014 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $14,213 | $10,295 | Implemented |
SF0455 # 05 Y:2014 | 05 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $232,437 | $204,574 | Implemented |
SF0455 # 06 Y:2014 | 06 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $12,943 | $11,569 | Implemented |
SF0455 # 07 Y:2014 | 07 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $4,151 | $3,742 | Implemented |
SF0455 # 08 Y:2014 | 08 | 2014 | USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS | $13,254 | $19,582 | Implemented |
SF0455 # 09 Y:2014 | 09 | 2014 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $13,364 | $21,937 | Implemented |
SF0455 # 10 Y:2014 | 10 | 2014 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $1,651 | $2,966 | Implemented |
SF0455 # 11 Y:2014 | 11 | 2014 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $40,078 | $103,067 | Implemented |