IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,059

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0407 # 08 Y:2001 08 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $289 $0 n/a
WI0406 # 01 Y:2001 01 2001 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $8,841 $0 Implemented
WI0406 # 02 Y:2001 02 2001 OPTIMIZE PLANT POWER FACTOR $7,981 $14,550 Not Implemented
WI0406 # 03 Y:2001 03 2001 INSTALL TIMERS AND/OR THERMOSTATS $3,632 $600 Not Implemented
WI0406 # 04 Y:2001 04 2001 INSTALL OCCUPANCY SENSORS $3,556 $3,880 Not Implemented
WI0406 # 05 Y:2001 05 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,901 $0 Not Implemented
WI0406 # 06 Y:2001 06 2001 REPLACE CLOTH RAGS WITH PAPER TOWELS $1,063 $0 Not Implemented
WI0406 # 07 Y:2001 07 2001 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $392 $556 Not Implemented
WI0405 # 01 Y:2001 01 2001 REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED $5,787 $4,500 Implemented
WI0405 # 02 Y:2001 02 2001 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $2,749 $2,000 Implemented
WI0405 # 03 Y:2001 03 2001 USE EVAPORATION TO CONCENTRATE MATERIAL $3,585 $11,000 Not Implemented
WI0405 # 04 Y:2001 04 2001 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $2,138 $0 Implemented
WI0405 # 05 Y:2001 05 2001 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,216 $500 Implemented
WI0405 # 06 Y:2001 06 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,839 $9,403 Not Implemented
WI0405 # 07 Y:2001 07 2001 REPLACE CLOTH RAGS WITH PAPER TOWELS $759 $0 Not Implemented
WI0405 # 08 Y:2001 08 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $340 $640 Not Implemented
WI0405 # 09 Y:2001 09 2001 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $269 $570 Not Implemented
WI0404 # 03 Y:2001 03 2001 INSTALL OCCUPANCY SENSORS $798 $2,400 Not Implemented
WI0404 # 04 Y:2001 04 2001 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $728 $1,190 Not Implemented
WI0404 # 05 Y:2001 05 2001 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $668 $1,600 Not Implemented
WI0404 # 06 Y:2001 06 2001 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $256 $640 Not Implemented
WI0404 # 07 Y:2001 07 2001 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $135 $400 Implemented
WI0404 # 01 Y:2001 01 2001 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $12,000 $0 Implemented
WI0404 # 02 Y:2001 02 2001 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $3,918 $14,500 Not Implemented
WI0403 # 01 Y:2001 01 2001 INSTALL AUTOMATIC PART STORAGE / RETREVAL SYSTEM $82,500 $120,000 Not Implemented