IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,708

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AS0323 # 06 Y:2002 06 2002 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $1,096 $2,100 Not Implemented
AS0323 # 07 Y:2002 07 2002 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE $1,800 $154 Implemented
AS0323 # 08 Y:2002 08 2002 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $29,052 $6,600 Implemented
AS0323 # 09 Y:2002 09 2002 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE LABOR COSTS $109,188 $7,050 Implemented
MI0038 # 01 Y:2002 01 2002 REPLACE OLD MACHINE WITH NEW AUTOMATIC MULTI-STATION TOOL $190,000 $100,000 Not Implemented
MI0038 # 02 Y:2002 02 2002 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK $18,650 $26,450 Implemented
MI0038 # 03 Y:2002 03 2002 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $3,094 $4,500 Not Implemented
MI0038 # 04 Y:2002 04 2002 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $1,846 $2,345 Not Implemented
MI0038 # 05 Y:2002 05 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $963 $250 Implemented
NC0231 # 01 Y:2002 01 2002 DEVELOP A REPAIR/REPLACE POLICY $2,088 $2,383 Not Implemented
NC0231 # 02 Y:2002 02 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $324 $736 Not Implemented
NC0231 # 03 Y:2002 03 2002 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,818 $830 Not Implemented
NC0231 # 04 Y:2002 04 2002 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $4,994 $200 Not Implemented
NC0231 # 05 Y:2002 05 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $29,626 $0 Implemented
WI0421 # 01 Y:2002 01 2002 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $9,343 $1,400 Not Implemented
WI0421 # 02 Y:2002 02 2002 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $7,154 $2,688 Not Implemented
WI0421 # 03 Y:2002 03 2002 INSTALL TIMERS AND/OR THERMOSTATS $4,470 $600 Implemented
WI0421 # 04 Y:2002 04 2002 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,940 $500 Implemented
WI0421 # 05 Y:2002 05 2002 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,752 $8,000 Not Implemented
TA0028 # 01 Y:2002 01 2002 PURCHASE RE-CONDITIONED MATERIAL INSTEAD OF NEW $36,360 $0 Not Implemented
TA0028 # 02 Y:2002 02 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $18,860 $600 Implemented
TA0028 # 03 Y:2002 03 2002 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $13,237 $0 Implemented
TA0028 # 04 Y:2002 04 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,290 $40 Implemented
TA0028 # 05 Y:2002 05 2002 PAY BILLS ON TIME TO AVOID LATE FEES $3,380 $0 Implemented
TA0028 # 06 Y:2002 06 2002 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,105 $390 Implemented