IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,215

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BS0054 # 06 Y:2015 06 2015 USE PROPER THICKNESS OF INSULATION ON BUILDING ENVELOPE $5,375 $50,351 Not Implemented
SU0387 # 01 Y:2015 01 2015 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,803 $0 Not Implemented
SU0387 # 02 Y:2015 02 2015 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $1,211 $0 Not Implemented
SU0387 # 03 Y:2015 03 2015 INSULATE BARE EQUIPMENT $988 $858 Not Implemented
SU0387 # 04 Y:2015 04 2015 REPLACE THE CHLORINATION STAGE WITH AN OXYGEN OR OZONE STAGE $15,923 $25,000 Not Implemented
SU0387 # 05 Y:2015 05 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $776 $1,546 Not Implemented
SU0387 # 06 Y:2015 06 2015 MAKE A NEW BY-PRODUCT $20,522 $100,000 Not Implemented
AM0682 # 01 Y:2015 01 2015 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $6,985 $2,000 Not Implemented
AM0682 # 02 Y:2015 02 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,480 $1,000 Implemented
AM0682 # 03 Y:2015 03 2015 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $4,320 $5,400 Not Implemented
AM0682 # 04 Y:2015 04 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,295 $7,280 Not Implemented
AM0682 # 05 Y:2015 05 2015 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $1,840 $1,790 Implemented
AM0682 # 06 Y:2015 06 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $585 $5 Implemented
AM0682 # 07 Y:2015 07 2015 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $430 $0 Not Implemented
AM0682 # 08 Y:2015 08 2015 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $211 $75 Implemented
AM0682 # 09 Y:2015 09 2015 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $170 $200 Implemented
AM0682 # 10 Y:2015 10 2015 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $150 $0 Implemented
BD0458 # 01 Y:2015 01 2015 USE RADIANT HEATER FOR SPOT HEATING $8,580 $11,200 Implemented
BD0458 # 02 Y:2015 02 2015 INSTALL OCCUPANCY SENSORS $3,722 $3,900 Implemented
BD0458 # 03 Y:2015 03 2015 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $3,605 $1,405 Implemented
BD0458 # 04 Y:2015 04 2015 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $3,038 $30 Implemented
BD0458 # 05 Y:2015 05 2015 USE SYNTHETIC LUBRICANT $2,628 $1,200 Implemented
BD0458 # 06 Y:2015 06 2015 USE PHOTOCELL CONTROLS $2,217 $2,520 Implemented
BD0458 # 07 Y:2015 07 2015 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,421 $105 Implemented
BD0458 # 08 Y:2015 08 2015 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,709 $675 Implemented