Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
8,718
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
IC0118 # 04 Y:2006 | 04 | 2006 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,612 | $0 | Implemented |
IC0118 # 05 Y:2006 | 05 | 2006 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $4,583 | $17,220 | Implemented |
IC0118 # 06 Y:2006 | 06 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,328 | $8,717 | Implemented |
IC0118 # 07 Y:2006 | 07 | 2006 | INSTALL / REPAIR INSULATION ON STEAM LINES | $2,403 | $2,544 | Implemented |
IC0118 # 08 Y:2006 | 08 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $953 | $1,200 | Implemented |
IC0118 # 09 Y:2006 | 09 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $428 | $516 | Implemented |
IC0118 # 10 Y:2006 | 10 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $235 | $1,132 | Implemented |
IC0118 # 11 Y:2006 | 11 | 2006 | INSTALL OCCUPANCY SENSORS | $62 | $291 | Not Implemented |
IC0117 # 01 Y:2006 | 01 | 2006 | RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER | $103,343 | $192,802 | Not Implemented |
IC0117 # 02 Y:2006 | 02 | 2006 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,880 | $0 | Not Implemented |
IC0117 # 03 Y:2006 | 03 | 2006 | UPGRADE CONTROLS ON COMPRESSORS | $5,541 | $1,690 | Not Implemented |
IC0117 # 04 Y:2006 | 04 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,086 | $2,100 | Not Implemented |
IC0117 # 05 Y:2006 | 05 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,057 | $0 | Not Implemented |
IC0117 # 06 Y:2006 | 06 | 2006 | RECOVER WASTE HEAT FROM EQUIPMENT | $5,809 | $34,020 | Not Implemented |
IC0117 # 07 Y:2006 | 07 | 2006 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $2,442 | $3,500 | Not Implemented |
IC0117 # 08 Y:2006 | 08 | 2006 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $11,574 | $88,643 | Not Implemented |
IC0117 # 09 Y:2006 | 09 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $6,256 | $8,992 | Not Implemented |
IC0117 # 10 Y:2006 | 10 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,391 | $8,404 | Not Implemented |
BD0315 # 01 Y:2006 | 01 | 2006 | USE RADIANT HEATER FOR SPOT HEATING | $12,408 | $12,368 | Not Implemented |
BD0315 # 02 Y:2006 | 02 | 2006 | REPOSITION OVEN WALLS TO REDUCE HEATED SPACE | $10,595 | $900 | Not Implemented |
BD0315 # 03 Y:2006 | 03 | 2006 | RECOVER WASTE HEAT FROM EQUIPMENT | $13,074 | $16,950 | Not Implemented |
BD0315 # 04 Y:2006 | 04 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,730 | $3,356 | Not Implemented |
BD0315 # 05 Y:2006 | 05 | 2006 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,369 | $750 | Implemented |
BD0315 # 06 Y:2006 | 06 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,167 | $7,043 | Not Implemented |
BD0315 # 07 Y:2006 | 07 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $382 | $379 | Implemented |