IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,871

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
TN0364 # 02 Y:1989 02 1989 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $112,374 $757,200 Not Implemented
TN0364 # 03 Y:1989 03 1989 USE MINIMUM STEAM OPERATING PRESSURE $15,272 $0 Not Implemented
TN0364 # 04 Y:1989 04 1989 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $5,471 $800 Implemented
TN0364 # 05 Y:1989 05 1989 CLOSE OFF UNNEEDED STEAM LINES $3,036 $0 Implemented
TN0364 # 06 Y:1989 06 1989 INSTALL SET-BACK TIMERS $3,442 $10,900 Not Implemented
UD0267 # 01 Y:1988 01 1988 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,625 $0 Implemented
UD0267 # 02 Y:1988 02 1988 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,250 $0 Not Implemented
UD0267 # 03 Y:1988 03 1988 CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS $10,439 $4,448 Implemented
UD0267 # 04 Y:1988 04 1988 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,285 $552 Implemented
TN0346 # 01 Y:1988 01 1988 INSTALL / REPAIR INSULATION ON STEAM LINES $14,628 $3,357 Implemented
TN0346 # 02 Y:1988 02 1988 INSTALL TIMERS AND/OR THERMOSTATS $11,227 $4,280 Not Implemented
TN0346 # 03 Y:1988 03 1988 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,714 $640 Implemented
TN0346 # 04 Y:1988 04 1988 REPAIR AND ELIMINATE STEAM LEAKS $1,960 $270 Implemented
TN0346 # 05 Y:1988 05 1988 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,550 $1,850 Implemented
TN0346 # 06 Y:1988 06 1988 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,747 $0 Implemented
TN0346 # 07 Y:1988 07 1988 INSULATE BARE EQUIPMENT $1,040 $75 Not Implemented
TN0346 # 08 Y:1988 08 1988 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $529 $990 Implemented
UD0261 # 01 Y:1988 01 1988 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $5,051 $0 Not Implemented
UD0261 # 02 Y:1988 02 1988 RECOVER AND REUSE COOLING WATER $3,120 $6,000 Implemented
UD0261 # 03 Y:1988 03 1988 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,080 $0 Implemented
UD0262 # 01 Y:1988 01 1988 OPTIMIZE PLANT POWER FACTOR $13,844 $17,000 Implemented
UD0262 # 02 Y:1988 02 1988 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $794 $60 Not Implemented
UD0262 # 03 Y:1988 03 1988 RECOVER WASTE HEAT FROM EQUIPMENT $6,565 $18,000 Not Implemented
UD0262 # 04 Y:1988 04 1988 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,829 $0 Not Implemented
UD0262 # 05 Y:1988 05 1988 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $7,880 $5,000 Not Implemented