Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
2,871
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
TN0364 # 02 Y:1989 | 02 | 1989 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $112,374 | $757,200 | Not Implemented |
TN0364 # 03 Y:1989 | 03 | 1989 | USE MINIMUM STEAM OPERATING PRESSURE | $15,272 | $0 | Not Implemented |
TN0364 # 04 Y:1989 | 04 | 1989 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $5,471 | $800 | Implemented |
TN0364 # 05 Y:1989 | 05 | 1989 | CLOSE OFF UNNEEDED STEAM LINES | $3,036 | $0 | Implemented |
TN0364 # 06 Y:1989 | 06 | 1989 | INSTALL SET-BACK TIMERS | $3,442 | $10,900 | Not Implemented |
UD0267 # 01 Y:1988 | 01 | 1988 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $2,625 | $0 | Implemented |
UD0267 # 02 Y:1988 | 02 | 1988 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $5,250 | $0 | Not Implemented |
UD0267 # 03 Y:1988 | 03 | 1988 | CONVERT COMBUSTION EQUIPMENT TO BURN NATURAL GAS | $10,439 | $4,448 | Implemented |
UD0267 # 04 Y:1988 | 04 | 1988 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $1,285 | $552 | Implemented |
TN0346 # 01 Y:1988 | 01 | 1988 | INSTALL / REPAIR INSULATION ON STEAM LINES | $14,628 | $3,357 | Implemented |
TN0346 # 02 Y:1988 | 02 | 1988 | INSTALL TIMERS AND/OR THERMOSTATS | $11,227 | $4,280 | Not Implemented |
TN0346 # 03 Y:1988 | 03 | 1988 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $2,714 | $640 | Implemented |
TN0346 # 04 Y:1988 | 04 | 1988 | REPAIR AND ELIMINATE STEAM LEAKS | $1,960 | $270 | Implemented |
TN0346 # 05 Y:1988 | 05 | 1988 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,550 | $1,850 | Implemented |
TN0346 # 06 Y:1988 | 06 | 1988 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,747 | $0 | Implemented |
TN0346 # 07 Y:1988 | 07 | 1988 | INSULATE BARE EQUIPMENT | $1,040 | $75 | Not Implemented |
TN0346 # 08 Y:1988 | 08 | 1988 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $529 | $990 | Implemented |
UD0261 # 01 Y:1988 | 01 | 1988 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $5,051 | $0 | Not Implemented |
UD0261 # 02 Y:1988 | 02 | 1988 | RECOVER AND REUSE COOLING WATER | $3,120 | $6,000 | Implemented |
UD0261 # 03 Y:1988 | 03 | 1988 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $6,080 | $0 | Implemented |
UD0262 # 01 Y:1988 | 01 | 1988 | OPTIMIZE PLANT POWER FACTOR | $13,844 | $17,000 | Implemented |
UD0262 # 02 Y:1988 | 02 | 1988 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $794 | $60 | Not Implemented |
UD0262 # 03 Y:1988 | 03 | 1988 | RECOVER WASTE HEAT FROM EQUIPMENT | $6,565 | $18,000 | Not Implemented |
UD0262 # 04 Y:1988 | 04 | 1988 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $4,829 | $0 | Not Implemented |
UD0262 # 05 Y:1988 | 05 | 1988 | USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS | $7,880 | $5,000 | Not Implemented |