IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,754

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
OK0556 # 04 Y:1998 04 1998 METER WASTE WATER $119,889 $0 Not Implemented
OK0556 # 05 Y:1998 05 1998 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,048 $3,000 Not Implemented
OK0556 # 06 Y:1998 06 1998 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $633 $1,020 Implemented
OK0556 # 07 Y:1998 07 1998 INSTALL SOLID WASTE INCINERATOR FOR HEAT $1,000 $0 Implemented
OK0555 # 01 Y:1998 01 1998 REDESIGN PROCESS $178,358 $248,000 Implemented
OK0555 # 02 Y:1998 02 1998 INSULATE BARE EQUIPMENT $2,417 $39,746 Implemented
OK0555 # 03 Y:1998 03 1998 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $20,281 $0 Implemented
OK0555 # 04 Y:1998 04 1998 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $9,562 $9,700 Implemented
OK0555 # 05 Y:1998 05 1998 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $6,911 $5,543 Not Implemented
OK0555 # 06 Y:1998 06 1998 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $6,825 $0 Implemented
OK0555 # 07 Y:1998 07 1998 OPTIMIZE PLANT POWER FACTOR $6,214 $1,483 Not Implemented
OK0555 # 08 Y:1998 08 1998 UTILIZE AN EVAPORATIVE AIR PRE-COOLER OR OTHER HEAT EXCHANGER IN AC SYSTEM $5,557 $25,000 Not Implemented
OK0555 # 09 Y:1998 09 1998 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,002 $320 Implemented
OK0555 # 10 Y:1998 10 1998 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $4,823 $2,100 Implemented
OK0555 # 11 Y:1998 11 1998 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,573 $5,000 Not Implemented
OK0555 # 12 Y:1998 12 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,948 $1,080 Not Implemented
OK0555 # 13 Y:1998 13 1998 INSTALL OCCUPANCY SENSORS $899 $585 Not Implemented
OK0554 # 01 Y:1998 01 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,306 $13,340 Not Implemented
OK0554 # 02 Y:1998 02 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $571 $2,830 Implemented
OK0554 # 03 Y:1998 03 1998 INSTALL OCCUPANCY SENSORS $12,689 $4,620 Not Implemented
OK0554 # 04 Y:1998 04 1998 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $258 $544 Not Implemented
OK0554 # 05 Y:1998 05 1998 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $17,170 $97,980 Not Implemented
OK0554 # 06 Y:1998 06 1998 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $812 $0 Implemented
OK0554 # 07 Y:1998 07 1998 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $3,600 $0 Implemented
OK0554 # 08 Y:1998 08 1998 RE-ARRANGE EQUIPMENT LAYOUT TO REDUCE HANDLING COSTS $210,600 $120,000 Not Implemented