Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,333
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
GT0691 # 02 Y:2000 | 02 | 2000 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $5,567 | $56,336 | Implemented |
GT0691 # 03 Y:2000 | 03 | 2000 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $1,350 | $324 | Not Implemented |
GT0691 # 04 Y:2000 | 04 | 2000 | ELIMINATE OR REDUCE COMPRESSED AIR USAGE | $13,915 | $29,000 | Not Implemented |
GT0691 # 05 Y:2000 | 05 | 2000 | MINIMIZE WATER USAGE | $8,289 | $2,400 | Implemented |
GT0691 # 06 Y:2000 | 06 | 2000 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $34,271 | $19,000 | Not Implemented |
GT0691 # 07 Y:2000 | 07 | 2000 | MINIMIZE WATER USAGE | $26,306 | $7,850 | Implemented |
GT0691 # 08 Y:2000 | 08 | 2000 | MOVE PRODUCT USING MECHANICAL MEANS | $39,645 | $60,000 | Not Implemented |
GT0691 # 09 Y:2000 | 09 | 2000 | USE OPTIMUM TEMPERATURE | $94,400 | $0 | Not Implemented |
DS0166 # 01 Y:2000 | 01 | 2000 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,974 | $251 | Implemented |
DS0166 # 02 Y:2000 | 02 | 2000 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,511 | $500 | Implemented |
DS0166 # 03 Y:2000 | 03 | 2000 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,561 | $21,339 | Not Implemented |
DS0166 # 04 Y:2000 | 04 | 2000 | INSTALL OCCUPANCY SENSORS | $970 | $648 | Not Implemented |
DS0166 # 05 Y:2000 | 05 | 2000 | OPTIMIZE PLANT POWER FACTOR | $2,134 | $1,750 | Not Implemented |
DS0166 # 06 Y:2000 | 06 | 2000 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $688 | $0 | Not Implemented |
DS0166 # 07 Y:2000 | 07 | 2000 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $1,174 | $4,000 | Not Implemented |
DS0166 # 08 Y:2000 | 08 | 2000 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $30,210 | $80,000 | Implemented |
DS0166 # 09 Y:2000 | 09 | 2000 | RECOVER AND REUSE WASTE MATERIAL | $1,440 | $1,175 | Not Implemented |
DS0166 # 10 Y:2000 | 10 | 2000 | $16,522 | $4,316 | Not Implemented | |
CO0466 # 01 Y:2000 | 01 | 2000 | USE DEMAND CONTROLLER OR LOAD SHEDDER | $4,420 | $10,000 | Implemented |
CO0466 # 02 Y:2000 | 02 | 2000 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $2,120 | $0 | Not Implemented |
CO0466 # 03 Y:2000 | 03 | 2000 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $540 | $870 | Not Implemented |
CO0466 # 04 Y:2000 | 04 | 2000 | INSTALL OCCUPANCY SENSORS | $470 | $1,000 | Implemented |
CO0466 # 05 Y:2000 | 05 | 2000 | UTILIZE DAYLIGHT WHENEVER POSSIBLE IN LIEU OF ARTIFICIAL LIGHT | $220 | $280 | Not Implemented |
CO0466 # 06 Y:2000 | 06 | 2000 | USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL | $640 | $0 | Implemented |
CO0466 # 07 Y:2000 | 07 | 2000 | MINIMIZE WATER USAGE | $1,030 | $320 | Implemented |