IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,708

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WI0421 # 04 Y:2002 04 2002 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $2,940 $500 Implemented
WI0421 # 05 Y:2002 05 2002 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $1,752 $8,000 Not Implemented
LE0137 # 01 Y:2002 01 2002 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR $54,428 $30,000 Not Implemented
LE0137 # 02 Y:2002 02 2002 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $20,604 $31,000 Not Implemented
LE0137 # 03 Y:2002 03 2002 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $43,767 $25,000 Not Implemented
LE0137 # 04 Y:2002 04 2002 RECOVER WASTE HEAT FROM EQUIPMENT $14,099 $11,750 Implemented
LE0137 # 05 Y:2002 05 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $6,615 $3,000 Implemented
LE0137 # 06 Y:2002 06 2002 DO NOT USE COMPRESSED AIR FOR PERSONAL COOLING $370 $700 Not Implemented
LE0137 # 07 Y:2002 07 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,702 $0 Not Implemented
TA0028 # 01 Y:2002 01 2002 $36,360 $0 Not Implemented
TA0028 # 02 Y:2002 02 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $18,860 $600 Implemented
TA0028 # 03 Y:2002 03 2002 USE DRYING OVEN (BATCH TYPE) ON ALTERNATE DAYS OR OTHER OPTIMUM SCHEDULE TO RUN EQUIPMENT WITH FULL LOADS $13,237 $0 Implemented
TA0028 # 04 Y:2002 04 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $8,290 $40 Implemented
TA0028 # 05 Y:2002 05 2002 $3,380 $0 Implemented
TA0028 # 06 Y:2002 06 2002 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $1,105 $390 Implemented
IA0290 # 01 Y:2002 01 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,977 $829 Implemented
IA0290 # 02 Y:2002 02 2002 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $190 $25 Not Implemented
IA0290 # 03 Y:2002 03 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,829 $13,425 Implemented
IA0290 # 04 Y:2002 04 2002 INSTALL OCCUPANCY SENSORS $1,312 $2,128 Not Implemented
IA0290 # 05 Y:2002 05 2002 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $18,198 $2,970 Not Implemented
IA0290 # 06 Y:2002 06 2002 TURN OFF EQUIPMENT WHEN NOT IN USE $29,170 $18,259 Implemented
IA0290 # 07 Y:2002 07 2002 $68,750 $58,676 Not Implemented
IC0035 # 01 Y:2002 01 2002 ADJUST BURNERS FOR EFFICIENT OPERATION $3,252 $1,500 Not Implemented
IC0035 # 02 Y:2002 02 2002 INSULATE BARE EQUIPMENT $12,947 $2,657 Implemented
IC0035 # 03 Y:2002 03 2002 INSULATE BARE EQUIPMENT $11,300 $7,092 Not Implemented