Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,204
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0601 # 05 Y:2006 | 05 | 2006 | SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY | $5,090 | $2,300 | Not Implemented |
WI0513 # 01 Y:2006 | 01 | 2006 | IMPROVE SPACE COMFORT CONDITIONING | $42,840 | $1,800 | Implemented |
WI0513 # 02 Y:2006 | 02 | 2006 | IMPROVE SPACE COMFORT CONDITIONING | $16,286 | $2,450 | Not Implemented |
WI0513 # 03 Y:2006 | 03 | 2006 | RECOVER WASTE HEAT FROM EQUIPMENT | $10,175 | $1,000 | Not Implemented |
WI0513 # 04 Y:2006 | 04 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,710 | $5,940 | Implemented |
WI0513 # 05 Y:2006 | 05 | 2006 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,821 | $640 | Not Implemented |
WI0513 # 06 Y:2006 | 06 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,987 | $450 | Not Implemented |
WI0513 # 07 Y:2006 | 07 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,529 | $0 | Implemented |
WI0513 # 08 Y:2006 | 08 | 2006 | INSTALL TIMERS AND/OR THERMOSTATS | $1,291 | $400 | Implemented |
WI0513 # 09 Y:2006 | 09 | 2006 | RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS | $1,277 | $200 | Implemented |
IC0114 # 01 Y:2006 | 01 | 2006 | INSTALL TURBULATORS | $42,000 | $7,500 | Not Implemented |
IC0114 # 02 Y:2006 | 02 | 2006 | CONVERT FROM INDIRECT TO DIRECT FIRED SYSTEMS | $16,000 | $84,000 | Not Implemented |
IC0114 # 03 Y:2006 | 03 | 2006 | MINIMIZE BOILER BLOWDOWN WITH BETTER FEEDWATER TREATMENT | $19,000 | $63,000 | Implemented |
IC0114 # 04 Y:2006 | 04 | 2006 | CONVERT FROM INDIRECT TO DIRECT FIRED SYSTEMS | $175,000 | $120,400 | Not Implemented |
IC0114 # 05 Y:2006 | 05 | 2006 | RECOVER WASTE HEAT FROM EQUIPMENT | $8,400 | $16,800 | Not Implemented |
IC0114 # 06 Y:2006 | 06 | 2006 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $4,216 | $5,280 | Not Implemented |
IC0114 # 07 Y:2006 | 07 | 2006 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $93,057 | $456,000 | Not Implemented |
IC0114 # 08 Y:2006 | 08 | 2006 | RE-USE OR RECYCLE HOT OR COLD PROCESS EXHAUST AIR | $91,228 | $834,000 | Not Implemented |
IC0114 # 09 Y:2006 | 09 | 2006 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $10,414 | $65,273 | Implemented |
IC0114 # 10 Y:2006 | 10 | 2006 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $2,000 | $8,400 | Implemented |
IC0114 # 11 Y:2006 | 11 | 2006 | INSTALL / REPAIR INSULATION ON STEAM LINES | $4,400 | $1,200 | Implemented |
IC0114 # 12 Y:2006 | 12 | 2006 | REPAIR AND ELIMINATE STEAM LEAKS | $2,000 | $2,800 | Implemented |
IC0114 # 13 Y:2006 | 13 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,383 | $9,400 | Implemented |
SU0231 # 01 Y:2006 | 01 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $11,122 | $0 | Not Implemented |
SU0231 # 02 Y:2006 | 02 | 2006 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $4,090 | $0 | Implemented |