IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,644

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0375 # 16 Y:2008 16 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,374 $52 Implemented
WV0375 # 17 Y:2008 17 2008 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,975 $652 Not Implemented
WV0375 # 18 Y:2008 18 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,797 $10,125 Implemented
WV0375 # 19 Y:2008 19 2008 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $2,275 $0 Not Implemented
LE0268 # 01 Y:2008 01 2008 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $331,483 $16,000 Not Implemented
LE0268 # 02 Y:2008 02 2008 USE SOLAR HEAT TO MAKE ELECTRICTY $104,249 $671,675 Not Implemented
LE0268 # 03 Y:2008 03 2008 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $71,498 $60,000 Not Implemented
LE0268 # 04 Y:2008 04 2008 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $25,491 $15,000 Not Implemented
LE0268 # 05 Y:2008 05 2008 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $16,931 $0 Implemented
LE0268 # 06 Y:2008 06 2008 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $42,587 $65,000 Not Implemented
LE0268 # 07 Y:2008 07 2008 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $4,832 $2,200 Not Implemented
LE0268 # 08 Y:2008 08 2008 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,134 $700 Not Implemented
LE0268 # 09 Y:2008 09 2008 TURN OFF EQUIPMENT WHEN NOT IN USE $931 $0 Implemented
LE0268 # 10 Y:2008 10 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $28,056 $46,378 Not Implemented
LE0268 # 11 Y:2008 11 2008 INSTALL OCCUPANCY SENSORS $2,089 $780 Not Implemented
WV0369 # 01 Y:2008 01 2008 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $108,677 $0 Implemented
WV0369 # 02 Y:2008 02 2008 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $77,536 $198,000 Not Implemented
WV0369 # 03 Y:2008 03 2008 USE RADIANT HEATER FOR SPOT HEATING $48,102 $41,400 Implemented
WV0369 # 04 Y:2008 04 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $18,982 $71,794 Implemented
WV0369 # 05 Y:2008 05 2008 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $16,912 $8,070 Not Implemented
WV0369 # 06 Y:2008 06 2008 OPTIMIZE PLANT POWER FACTOR $7,680 $24,500 Implemented
WV0369 # 07 Y:2008 07 2008 ISOLATE HOT OR COLD EQUIPMENT $5,682 $952 Implemented
WV0369 # 08 Y:2008 08 2008 RECOVER WASTE HEAT FROM EQUIPMENT $5,504 $2,520 Not Implemented
WV0369 # 09 Y:2008 09 2008 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $5,365 $11,160 Not Implemented
WV0369 # 10 Y:2008 10 2008 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,950 $0 Implemented