IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,777

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
RU0145 # 03 Y:1992 03 1992 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $500 $571 Implemented
RU0145 # 04 Y:1992 04 1992 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $1,450 $500 Implemented
RU0145 # 05 Y:1992 05 1992 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,099 $0 Implemented
RU0145 # 06 Y:1992 06 1992 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $583 $500 Not Implemented
RU0146 # 01 Y:1992 01 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $621 $79 Not Implemented
RU0146 # 02 Y:1992 02 1992 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $256 $500 Not Implemented
RU0146 # 03 Y:1992 03 1992 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $1,643 $3,420 Not Implemented
RU0146 # 04 Y:1992 04 1992 INSTALL SET-BACK TIMERS $3,358 $956 Not Implemented
RU0146 # 05 Y:1992 05 1992 USE DEMAND CONTROLLER OR LOAD SHEDDER $4,489 $2,500 Not Implemented
RU0146 # 06 Y:1992 06 1992 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $652 $734 Not Implemented
RU0146 # 07 Y:1992 07 1992 IMPROVE LUBRICATION PRACTICES $1,624 $800 Not Implemented
RU0146 # 08 Y:1992 08 1992 REDUCE OR ELIMINATE WASTE $1,440 $450 Not Implemented
KU0368 # 01 Y:1992 01 1992 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,112 $21,000 Not Implemented
KU0368 # 02 Y:1992 02 1992 INSULATE BARE EQUIPMENT $5,425 $6,112 Not Implemented
KU0368 # 03 Y:1992 03 1992 INSTALL SET-BACK TIMERS $5,403 $5,376 Not Implemented
KU0368 # 04 Y:1992 04 1992 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,931 $0 Implemented
KU0368 # 05 Y:1992 05 1992 INSTALL TIMERS AND/OR THERMOSTATS $707 $0 Implemented
KU0369 # 01 Y:1992 01 1992 PURCHASE GAS DIRECTLY FROM A CONTRACT GAS SUPPLIER $14,242 $0 Not Implemented
KU0369 # 02 Y:1992 02 1992 USE RADIANT HEATER FOR SPOT HEATING $10,390 $38,850 Not Implemented
KU0369 # 03 Y:1992 03 1992 INSTALL TIMERS AND/OR THERMOSTATS $1,781 $430 Implemented
KU0369 # 04 Y:1992 04 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $466 $1,769 Not Implemented
KU0369 # 05 Y:1992 05 1992 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $366 $0 Not Implemented
KU0369 # 06 Y:1992 06 1992 INSTALL SET-BACK TIMERS $918 $750 Not Implemented
KU0369 # 07 Y:1992 07 1992 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,856 $125 Implemented
KU0369 # 08 Y:1992 08 1992 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $1,147 $0 Not Implemented