Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,640
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SD0282 # 13 Y:2001 | 13 | 2001 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $21,020 | $20,000 | Not Implemented |
SD0282 # 14 Y:2001 | 14 | 2001 | USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME | $2,925 | $1,500 | Not Implemented |
SD0282 # 15 Y:2001 | 15 | 2001 | USE EVAPORATION TO CONCENTRATE MATERIAL | $13,681 | $3,000 | Not Implemented |
SD0282 # 16 Y:2001 | 16 | 2001 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $3,022,214 | $480,000 | Not Implemented |
SD0282 # 17 Y:2001 | 17 | 2001 | PAY BILLS ON TIME TO AVOID LATE FEES | $1,777 | $0 | Implemented |
OR0391 # 01 Y:2001 | 01 | 2001 | OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES | $324,000 | $79,300 | Implemented |
OR0391 # 02 Y:2001 | 02 | 2001 | CONTRACT A WOOD PALLET RECYCLING COMPANY | $2,300 | $0 | Implemented |
OR0391 # 03 Y:2001 | 03 | 2001 | COMBINE UTILITY METERS | $8,935 | $24,325 | Not Implemented |
OR0391 # 04 Y:2001 | 04 | 2001 | OPTIMIZE PLANT POWER FACTOR | $2,855 | $8,000 | Not Implemented |
OR0391 # 05 Y:2001 | 05 | 2001 | INSTALL COMMON HEADER ON COMPRESSORS | $2,248 | $6,400 | Not Implemented |
LM0009 # 01 Y:2001 | 01 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $35,795 | $195 | n/a |
LM0009 # 02 Y:2001 | 02 | 2001 | INSTALL SKYLIGHTS | $36,728 | $66,000 | n/a |
LM0009 # 03 Y:2001 | 03 | 2001 | REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL | $8,805 | $12,000 | n/a |
LM0009 # 04 Y:2001 | 04 | 2001 | RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS | $95,096 | $450 | n/a |
LM0009 # 05 Y:2001 | 05 | 2001 | INSTALL SENSORS TO DETECT DEFECTS | $1,277,400 | $300,000 | n/a |
LM0009 # 06 Y:2001 | 06 | 2001 | TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY | $90,000 | $45,696 | n/a |
MI0005 # 01 Y:2001 | 01 | 2001 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $13,307 | $1,381 | Not Implemented |
MI0005 # 02 Y:2001 | 02 | 2001 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $10,759 | $11 | Not Implemented |
MI0005 # 03 Y:2001 | 03 | 2001 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $2,110 | $423 | Not Implemented |
MI0005 # 04 Y:2001 | 04 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $2,655 | $3,000 | Not Implemented |
MI0005 # 05 Y:2001 | 05 | 2001 | ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE | $149,887 | $23,328 | Not Implemented |
MI0005 # 06 Y:2001 | 06 | 2001 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $41,430 | $11,232 | Not Implemented |
CO0484 # 01 Y:2001 | 01 | 2001 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $8,050 | $8,660 | n/a |
CO0484 # 02 Y:2001 | 02 | 2001 | LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA | $7,440 | $1,670 | n/a |
CO0484 # 03 Y:2001 | 03 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $4,610 | $390 | n/a |