IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,640

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0282 # 13 Y:2001 13 2001 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS $21,020 $20,000 Not Implemented
SD0282 # 14 Y:2001 14 2001 USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME $2,925 $1,500 Not Implemented
SD0282 # 15 Y:2001 15 2001 USE EVAPORATION TO CONCENTRATE MATERIAL $13,681 $3,000 Not Implemented
SD0282 # 16 Y:2001 16 2001 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES $3,022,214 $480,000 Not Implemented
SD0282 # 17 Y:2001 17 2001 PAY BILLS ON TIME TO AVOID LATE FEES $1,777 $0 Implemented
OR0391 # 01 Y:2001 01 2001 OPTIMIZE PRODUCTION LOT SIZES AND INVENTORIES $324,000 $79,300 Implemented
OR0391 # 02 Y:2001 02 2001 CONTRACT A WOOD PALLET RECYCLING COMPANY $2,300 $0 Implemented
OR0391 # 03 Y:2001 03 2001 COMBINE UTILITY METERS $8,935 $24,325 Not Implemented
OR0391 # 04 Y:2001 04 2001 OPTIMIZE PLANT POWER FACTOR $2,855 $8,000 Not Implemented
OR0391 # 05 Y:2001 05 2001 INSTALL COMMON HEADER ON COMPRESSORS $2,248 $6,400 Not Implemented
LM0009 # 01 Y:2001 01 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $35,795 $195 n/a
LM0009 # 02 Y:2001 02 2001 INSTALL SKYLIGHTS $36,728 $66,000 n/a
LM0009 # 03 Y:2001 03 2001 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $8,805 $12,000 n/a
LM0009 # 04 Y:2001 04 2001 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $95,096 $450 n/a
LM0009 # 05 Y:2001 05 2001 INSTALL SENSORS TO DETECT DEFECTS $1,277,400 $300,000 n/a
LM0009 # 06 Y:2001 06 2001 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY $90,000 $45,696 n/a
MI0005 # 01 Y:2001 01 2001 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $13,307 $1,381 Not Implemented
MI0005 # 02 Y:2001 02 2001 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $10,759 $11 Not Implemented
MI0005 # 03 Y:2001 03 2001 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS $2,110 $423 Not Implemented
MI0005 # 04 Y:2001 04 2001 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,655 $3,000 Not Implemented
MI0005 # 05 Y:2001 05 2001 ESTABLISH EQUIPMENT MAINTENANCE SCHEDULE $149,887 $23,328 Not Implemented
MI0005 # 06 Y:2001 06 2001 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $41,430 $11,232 Not Implemented
CO0484 # 01 Y:2001 01 2001 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS $8,050 $8,660 n/a
CO0484 # 02 Y:2001 02 2001 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $7,440 $1,670 n/a
CO0484 # 03 Y:2001 03 2001 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $4,610 $390 n/a