IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,533

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SD0364 # 03 Y:2005 03 2005 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY $3,260 $6,300 Implemented
SD0364 # 04 Y:2005 04 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,016 $440 Implemented
SD0364 # 05 Y:2005 05 2005 INSTALL OCCUPANCY SENSORS $413 $400 Not Implemented
CO0563 # 02 Y:2005 02 2005 TURN OFF EQUIPMENT WHEN NOT IN USE $26,550 $89,981 Implemented
CO0563 # 03 Y:2005 03 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $3,440 $9,180 Not Implemented
CO0563 # 04 Y:2005 04 2005 USE SYNTHETIC LUBRICANT $2,710 $1,660 Not Implemented
CO0563 # 05 Y:2005 05 2005 TURN OFF EQUIPMENT WHEN NOT IN USE $820 $0 Implemented
CO0563 # 06 Y:2005 06 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,330 $26,160 Implemented
CO0563 # 07 Y:2005 07 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $8,040 $26,010 Implemented
GT0806 # 01 Y:2005 01 2005 INSULATE BARE EQUIPMENT $22,100 $2,782 Not Implemented
GT0806 # 02 Y:2005 02 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,230 $2,150 Implemented
GT0806 # 03 Y:2005 03 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $24,900 $52,200 Not Implemented
GT0806 # 04 Y:2005 04 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,300 $23,431 Not Implemented
GT0806 # 05 Y:2005 05 2005 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $1,600 $2,613 Not Implemented
GT0806 # 06 Y:2005 06 2005 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $28,900 $135,800 Not Implemented
GT0806 # 07 Y:2005 07 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $26,000 $59,670 Not Implemented
GT0806 # 08 Y:2005 08 2005 REPLACE HYDRAULIC / PNEUMATIC EQUIPMENT WITH ELECTRIC EQUIPMENT $10,300 $13,870 Not Implemented
CO0563 # 01 Y:2005 01 2005 USE / PURCHASE OPTIMUM SIZED COMPRESSOR $56,710 $346,448 Implemented
BD0289 # 01 Y:2005 01 2005 RECOVER WASTE HEAT FROM EQUIPMENT $6,189 $3,500 Implemented
BD0289 # 02 Y:2005 02 2005 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $4,957 $0 Implemented
BD0289 # 03 Y:2005 03 2005 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $2,275 $6,900 Implemented
BD0289 # 04 Y:2005 04 2005 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $1,225 $1,500 Not Implemented
BD0289 # 05 Y:2005 05 2005 INSTALL OCCUPANCY SENSORS $910 $1,050 Implemented
BD0289 # 06 Y:2005 06 2005 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $694 $900 Not Implemented
BD0289 # 07 Y:2005 07 2005 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR $770 $1,780 Implemented