IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,602

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0619 # 07 Y:2012 07 2012 PAY UTILITY BILLS ON TIME $402 $0 Implemented
AM0619 # 08 Y:2012 08 2012 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE $337 $0 Implemented
AM0618 # 01 Y:2012 01 2012 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL $23,700 $0 Not Implemented
AM0618 # 02 Y:2012 02 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $8,050 $500 Not Implemented
AM0618 # 03 Y:2012 03 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,200 $17,720 Not Implemented
AM0618 # 04 Y:2012 04 2012 REUSE RAGS UNTIL COMPLETELY SOILED $2,230 $0 Not Implemented
AM0618 # 05 Y:2012 05 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,940 $920 Not Implemented
AM0618 # 06 Y:2012 06 2012 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $1,000 $190 Not Implemented
AM0618 # 07 Y:2012 07 2012 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $750 $0 Not Implemented
AM0618 # 08 Y:2012 08 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $650 $25 Not Implemented
AM0618 # 09 Y:2012 09 2012 USE SYNTHETIC LUBRICANT $360 $0 Not Implemented
AM0617 # 01 Y:2012 01 2012 DEVELOP STANDARD OPERATING PROCEDURES $191,786 $6,200 Not Implemented
AM0617 # 02 Y:2012 02 2012 RECOVER WASTE HEAT FROM EQUIPMENT $153,000 $375,000 Not Implemented
AM0617 # 03 Y:2012 03 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $6,264 $2,775 Implemented
AM0617 # 04 Y:2012 04 2012 MODIFY PROCESS TO REDUCE MATERIAL USE/COST $2,146 $0 Implemented
AM0617 # 05 Y:2012 05 2012 INSTALL OCCUPANCY SENSORS $2,056 $1,562 Implemented
AM0617 # 06 Y:2012 06 2012 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,871 $64 Implemented
AM0617 # 07 Y:2012 07 2012 RECYCLE WHITE WATER $1,161 $7,179 Implemented
AM0617 # 08 Y:2012 08 2012 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $911 $5,377 Implemented
AM0617 # 09 Y:2012 09 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $630 $300 Implemented
AM0616 # 01 Y:2012 01 2012 INSULATE BARE EQUIPMENT $28,900 $630 Not Implemented
AM0616 # 02 Y:2012 02 2012 OPTIMIZE PLANT POWER FACTOR $24,000 $27,300 Not Implemented
AM0616 # 03 Y:2012 03 2012 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $6,820 $390 Not Implemented
AM0616 # 04 Y:2012 04 2012 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $4,980 $0 Not Implemented
AM0616 # 05 Y:2012 05 2012 USE SYNTHETIC LUBRICANT $1,758 $0 Not Implemented