Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
6,055
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0067 # 03 Y:1995 | 03 | 1995 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $1,573 | $0 | Implemented |
WV0067 # 04 Y:1995 | 04 | 1995 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $561 | $260 | Not Implemented |
WV0067 # 05 Y:1995 | 05 | 1995 | INSTALL / REPAIR INSULATION ON STEAM LINES | $224 | $140 | Implemented |
WV0067 # 06 Y:1995 | 06 | 1995 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $172 | $500 | Not Implemented |
WV0067 # 07 Y:1995 | 07 | 1995 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $2,296 | $3,500 | Not Implemented |
SD0127 # 01 Y:1995 | 01 | 1995 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $3,637 | $5,890 | Implemented |
SD0127 # 02 Y:1995 | 02 | 1995 | USE COOLING TOWER WATER INSTEAD OF REFRIGERATION | $18,822 | $32,000 | Implemented |
SD0127 # 03 Y:1995 | 03 | 1995 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $914 | $16 | Implemented |
SD0127 # 04 Y:1995 | 04 | 1995 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,145 | $7,922 | Implemented |
SD0127 # 05 Y:1995 | 05 | 1995 | INSTALL SPECTRAL REFLECTORS / DELAMP | $11,158 | $13,280 | Implemented |
SD0127 # 06 Y:1995 | 06 | 1995 | INSTALL OCCUPANCY SENSORS | $3,379 | $2,569 | Implemented |
UL0130 # 01 Y:1995 | 01 | 1995 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $922 | $0 | Not Implemented |
UL0130 # 02 Y:1995 | 02 | 1995 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,808 | $4,595 | Not Implemented |
UL0130 # 03 Y:1995 | 03 | 1995 | OPTIMIZE PLANT POWER FACTOR | $11,418 | $5,400 | Not Implemented |
UL0130 # 04 Y:1995 | 04 | 1995 | OPTIMIZE PLANT POWER FACTOR | $17,564 | $10,120 | Not Implemented |
UL0130 # 05 Y:1995 | 05 | 1995 | INSTALL SMALLER BOILER (INCREASE HIGH FIRE DUTY CYCLE) | $4,704 | $20,700 | Not Implemented |
MS0029 # 01 Y:1995 | 01 | 1995 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,203 | $11,327 | Implemented |
MS0029 # 02 Y:1995 | 02 | 1995 | DIRECT WARMEST AIR TO COMBUSTION INTAKE | $10,983 | $30,000 | Not Implemented |
MS0029 # 03 Y:1995 | 03 | 1995 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $1,062 | $45 | Implemented |
MS0029 # 04 Y:1995 | 04 | 1995 | USE WASTE HEAT TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR | $53,973 | $165,000 | Not Implemented |
MS0029 # 05 Y:1995 | 05 | 1995 | INSTALL TIMERS AND/OR THERMOSTATS | $1,432 | $262 | Implemented |
MS0030 # 01 Y:1995 | 01 | 1995 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,709 | $3,855 | Implemented |
MS0030 # 02 Y:1995 | 02 | 1995 | RECOVER WASTE HEAT FROM EQUIPMENT | $579 | $1,200 | Implemented |
MS0030 # 03 Y:1995 | 03 | 1995 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $5,047 | $200 | Not Implemented |
MS0030 # 04 Y:1995 | 04 | 1995 | USE WATER ON AIR CONDITIONING EXCHANGER TO IMPROVE HEAT TRANSFER AND INCREASE AIR CONDITIONER EFFICIENCY | $1,870 | $5,100 | Not Implemented |