Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
5,394
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0295 # 06 Y:2004 | 06 | 2004 | COVER OPEN TANKS | $1,229 | $2,250 | Implemented |
WV0295 # 07 Y:2004 | 07 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,212 | $300 | Implemented |
WV0295 # 08 Y:2004 | 08 | 2004 | REDUCE DEFECTS BY REDUCING PRODUCT TIPPING | $30,991 | $1,500 | Not Implemented |
WV0295 # 09 Y:2004 | 09 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $775 | $60 | Implemented |
WV0295 # 10 Y:2004 | 10 | 2004 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $654 | $210 | Not Implemented |
WV0295 # 11 Y:2004 | 11 | 2004 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $604 | $1,000 | Not Implemented |
WV0295 # 12 Y:2004 | 12 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $396 | $0 | Implemented |
WV0295 # 13 Y:2004 | 13 | 2004 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $281 | $150 | Not Implemented |
WV0295 # 14 Y:2004 | 14 | 2004 | USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY | $245 | $165 | Implemented |
MA0555 # 01 Y:2004 | 01 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $212,625 | $986,100 | Implemented |
MA0555 # 02 Y:2004 | 02 | 2004 | REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT | $16,690 | $81,637 | Implemented |
MA0555 # 03 Y:2004 | 03 | 2004 | IMPROVE COMBUSTION CONTROL CAPABILITY | $1,915 | $44,790 | Implemented |
MA0555 # 04 Y:2004 | 04 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $3,282 | $5,430 | Implemented |
MA0555 # 05 Y:2004 | 05 | 2004 | INSTALL TIMERS AND/OR THERMOSTATS | $2,840 | $500 | Implemented |
MA0555 # 06 Y:2004 | 06 | 2004 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,791 | $4,850 | Implemented |
MA0555 # 07 Y:2004 | 07 | 2004 | INSTALL OCCUPANCY SENSORS | $1,836 | $768 | Implemented |
MA0555 # 08 Y:2004 | 08 | 2004 | INSTALL TIMERS AND/OR THERMOSTATS | $1,139 | $650 | Implemented |
MA0555 # 09 Y:2004 | 09 | 2004 | INSTALL OCCUPANCY SENSORS | $535 | $180 | Implemented |
AS0380 # 01 Y:2004 | 01 | 2004 | REPLACE ELECTRIC MOTOR WITH FOSSIL FUEL ENGINE | $84,336 | $312,400 | Implemented |
AS0380 # 02 Y:2004 | 02 | 2004 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $9,343 | $30 | Implemented |
AS0380 # 03 Y:2004 | 03 | 2004 | REPROCESS SPENT OILS ON SITE FOR RE-USE | $6,189 | $11,970 | Implemented |
AS0380 # 04 Y:2004 | 04 | 2004 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $2,340 | $7,360 | Implemented |
AS0380 # 05 Y:2004 | 05 | 2004 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,986 | $20 | Not Implemented |
AS0380 # 06 Y:2004 | 06 | 2004 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $1,843 | $1,418 | Implemented |
AS0380 # 07 Y:2004 | 07 | 2004 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $1,783 | $1,320 | Not Implemented |