Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,204
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0340 # 07 Y:2006 | 07 | 2006 | USE SYNTHETIC LUBRICANT | $3,001 | $90 | Implemented |
WV0340 # 08 Y:2006 | 08 | 2006 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $2,647 | $1,000 | Implemented |
WV0340 # 09 Y:2006 | 09 | 2006 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,384 | $800 | Implemented |
WV0340 # 10 Y:2006 | 10 | 2006 | UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS | $2,262 | $0 | Implemented |
WV0340 # 11 Y:2006 | 11 | 2006 | DEVELOP A REPAIR/REPLACE POLICY | $2,152 | $439 | Implemented |
WV0340 # 12 Y:2006 | 12 | 2006 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $928 | $1,270 | Implemented |
WV0340 # 13 Y:2006 | 13 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $598 | $1,170 | Implemented |
NC0335 # 01 Y:2006 | 01 | 2006 | MODIFY PROCESS TO REDUCE MATERIAL USE/COST | $20,000 | $4,500 | Not Implemented |
NC0335 # 02 Y:2006 | 02 | 2006 | RECOVER WASTE HEAT FROM EQUIPMENT | $21,192 | $1,000 | Not Implemented |
NC0335 # 03 Y:2006 | 03 | 2006 | DEVELOP A REPAIR/REPLACE POLICY | $244 | $248 | Implemented |
NC0335 # 04 Y:2006 | 04 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $752 | $500 | Implemented |
NC0335 # 05 Y:2006 | 05 | 2006 | MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED | $398 | $100 | Implemented |
NC0335 # 06 Y:2006 | 06 | 2006 | INSTALL / REPAIR INSULATION ON STEAM LINES | $67 | $147 | Implemented |
NC0335 # 07 Y:2006 | 07 | 2006 | INSTALL SENSORS TO DETECT DEFECTS | $1,400 | $1,000 | Implemented |
NC0336 # 01 Y:2006 | 01 | 2006 | RECOVER WASTE HEAT FROM EQUIPMENT | $13,979 | $24,586 | Not Implemented |
NC0336 # 02 Y:2006 | 02 | 2006 | RECOVERY METALS FROM RINSE WATER(EVAP., ION EXCHANGE, RO, ELECTROLYSIS, ELECTRODIALYSIS) AND REUSE RINSE WATER | $8,595 | $1,300 | Not Implemented |
NC0336 # 03 Y:2006 | 03 | 2006 | ADJUST BURNERS FOR EFFICIENT OPERATION | $2,620 | $1,500 | Not Implemented |
NC0336 # 04 Y:2006 | 04 | 2006 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $9,620 | $20,000 | Not Implemented |
NC0336 # 05 Y:2006 | 05 | 2006 | INCREASE AMOUNT OF CONDENSATE RETURNED | $12,198 | $7,290 | Implemented |
NC0336 # 06 Y:2006 | 06 | 2006 | INSTALL / REPAIR INSULATION ON STEAM LINES | $2,156 | $455 | Not Implemented |
NC0336 # 07 Y:2006 | 07 | 2006 | AIR CONDITION ONLY SPACE NECESSARY | $11,658 | $6,500 | Not Implemented |
NC0336 # 08 Y:2006 | 08 | 2006 | INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT | $18,883 | $20,000 | Implemented |
NC0336 # 09 Y:2006 | 09 | 2006 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,535 | $100 | Implemented |
NC0336 # 10 Y:2006 | 10 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,046 | $1,735 | Not Implemented |
NC0336 # 11 Y:2006 | 11 | 2006 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $3,361 | $50 | Not Implemented |