Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,640
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
SD0280 # 06 Y:2001 | 06 | 2001 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $13,928 | $18,000 | Not Implemented |
SD0280 # 07 Y:2001 | 07 | 2001 | ELIMINATE COOLING OF PROCESS STREAMS WHICH SUBSEQUENTLY MUST BE HEATED AND VICE VERSA | $16,954 | $30,000 | Not Implemented |
SD0280 # 08 Y:2001 | 08 | 2001 | INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS | $4,540 | $15,000 | Not Implemented |
SD0280 # 09 Y:2001 | 09 | 2001 | USE SAND FOR OTHER PURPOSES (EG CONSTRUCTION FILL, COVER FOR MUNICIPAL LANDFILLS) | $41,000 | $0 | Not Implemented |
SD0280 # 10 Y:2001 | 10 | 2001 | RECOVER AND REUSE WASTE MATERIAL | $34,600 | $75,000 | Not Implemented |
SD0280 # 11 Y:2001 | 11 | 2001 | REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES | $42,075 | $50,000 | Not Implemented |
SD0280 # 12 Y:2001 | 12 | 2001 | CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE | $13,200 | $35,000 | Not Implemented |
SU0106 # 01 Y:2001 | 01 | 2001 | CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE | $10,051 | $0 | Implemented |
SU0106 # 02 Y:2001 | 02 | 2001 | USE A FOSSIL FUEL ENGINE TO COGENERATE ELECTRICITY OR MOTIVE POWER; AND UTILIZE HEAT | $399,407 | $1,400,000 | Not Implemented |
SU0106 # 03 Y:2001 | 03 | 2001 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,947 | $2,241 | Not Implemented |
SU0106 # 04 Y:2001 | 04 | 2001 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $6,158 | $500 | Implemented |
SU0106 # 05 Y:2001 | 05 | 2001 | OPTIMIZE PLANT POWER FACTOR | $3,243 | $10,210 | Implemented |
LM0008 # 01 Y:2001 | 01 | 2001 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,518 | $500 | Implemented |
LM0008 # 02 Y:2001 | 02 | 2001 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $44,725 | $15,270 | Not Implemented |
LM0008 # 03 Y:2001 | 03 | 2001 | REDUCE HOT WATER TEMPERATURE TO THE MINIMUM REQUIRED | $787 | $0 | Implemented |
LM0008 # 04 Y:2001 | 04 | 2001 | RECOVER WASTE HEAT FROM EQUIPMENT | $9,758 | $1,463 | Not Implemented |
LM0008 # 05 Y:2001 | 05 | 2001 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $36,000 | $27,600 | Implemented |
LM0008 # 06 Y:2001 | 06 | 2001 | TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY | $146,432 | $17,000 | Implemented |
LM0008 # 07 Y:2001 | 07 | 2001 | HIRE ADDITIONAL PERSONNEL TO REDUCE CHANGEOUT TIME | $332,648 | $0 | Implemented |
MA0487 # 01 Y:2001 | 01 | 2001 | ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS | $496,200 | $950,000 | Not Implemented |
MA0487 # 02 Y:2001 | 02 | 2001 | ADD/MODIFY EQUIPMENT TO IMPROVE DRYING PROCESS | $432,600 | $425,000 | Not Implemented |
MA0487 # 03 Y:2001 | 03 | 2001 | USE HOT PROCESS FLUIDS TO PREHEAT INCOMING PROCESS FLUIDS | $122,200 | $165,000 | Not Implemented |
MA0487 # 04 Y:2001 | 04 | 2001 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $155,300 | $44,000 | Not Implemented |
MA0487 # 05 Y:2001 | 05 | 2001 | RECOVER WASTE HEAT FROM EQUIPMENT | $112,000 | $135,000 | Not Implemented |
MA0487 # 06 Y:2001 | 06 | 2001 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $72,000 | $100,000 | Not Implemented |