IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

27,466

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0675 # 11 Y:2024 11 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $515 $26 Implemented
UD1097 # 01 Y:2025 01 2025 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $63,287 $0 Implemented
UD1097 # 02 Y:2025 02 2025 USE FLOW CONTROL VALVES ON EQUIPMENT TO OPTIMIZE WATER USE $2,598 $104 Implemented
UD1097 # 03 Y:2025 03 2025 MINIMIZE WATER USAGE $1,616 $0 Implemented
UD1097 # 04 Y:2025 04 2025 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $1,568 $0 Not Implemented
UD1097 # 05 Y:2025 05 2025 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $471 $320 Implemented
UD1097 # 06 Y:2025 06 2025 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $400 $900 Implemented
UD1097 # 07 Y:2025 07 2025 ELIMINATE OR REDUCE COMPRESSED AIR USAGE $296 $0 Implemented
UD1097 # 08 Y:2025 08 2025 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $9,220 $14,406 Implemented
UD1097 # 09 Y:2025 09 2025 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $4,544 $0 Implemented
GT0988 # 01 Y:2025 01 2025 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $14,344 $800 n/a
GT0988 # 02 Y:2025 02 2025 CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE $5,947 $400 n/a
GT0988 # 03 Y:2025 03 2025 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $18,172 $1,850 n/a
GT0988 # 04 Y:2025 04 2025 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $598 $200 n/a
GT0988 # 05 Y:2025 05 2025 OPTIMIZE PLANT POWER FACTOR $10,998 $47,093 n/a
GT0988 # 06 Y:2025 06 2025 USE SOLAR HEAT TO MAKE ELECTRICTY $91,923 $962,674 n/a
MS0443 # 01 Y:2024 01 2024 USE SOLAR HEAT TO MAKE ELECTRICTY $31,318 $433,405 n/a
MS0443 # 02 Y:2024 02 2024 INSTALL AN UNINTERUPTABLE POWER SUPPLY $51,282 $1,786,854 n/a
MS0443 # 03 Y:2024 03 2024 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT $1,762 $50,000 n/a
MI0452 # 01 Y:2024 01 2024 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $5,470 $860 Not Implemented
MI0452 # 02 Y:2024 02 2024 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS $1,989 $960 Not Implemented
MI0452 # 03 Y:2024 03 2024 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $2,550 $1,660 Not Implemented
MI0452 # 04 Y:2024 04 2024 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $6,049 $4,092 Not Implemented
MI0452 # 05 Y:2024 05 2024 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $16,650 $23,081 Not Implemented
MI0452 # 06 Y:2024 06 2024 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $14,517 $21,120 Not Implemented