Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
9,942
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
WV0457 # 03 Y:2012 | 03 | 2012 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $4,482 | $500 | Implemented |
WV0457 # 04 Y:2012 | 04 | 2012 | USE HEAT FROM BOILER BLOWDOWN TO PREHEAT BOILER FEED WATER | $4,000 | $12,251 | Not Implemented |
WV0457 # 05 Y:2012 | 05 | 2012 | INSULATE BARE EQUIPMENT | $2,539 | $5,407 | Implemented |
WV0457 # 06 Y:2012 | 06 | 2012 | DEVELOP A REPAIR/REPLACE POLICY | $2,244 | $775 | Not Implemented |
WV0457 # 07 Y:2012 | 07 | 2012 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $2,189 | $1,000 | Implemented |
WV0457 # 08 Y:2012 | 08 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,415 | $2,620 | Not Implemented |
WV0457 # 09 Y:2012 | 09 | 2012 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $1,194 | $150 | Not Implemented |
WV0457 # 10 Y:2012 | 10 | 2012 | RECOVER WASTE HEAT FROM EQUIPMENT | $1,022 | $950 | Not Implemented |
WV0457 # 11 Y:2012 | 11 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $330 | $50 | Implemented |
WV0457 # 12 Y:2012 | 12 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $112 | $305 | Not Implemented |
UD0866 # 01 Y:2012 | 01 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $22,071 | $41,345 | Implemented |
UD0866 # 02 Y:2012 | 02 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $13,212 | $29,160 | Not Implemented |
UD0866 # 03 Y:2012 | 03 | 2012 | INSTALL OCCUPANCY SENSORS | $7,111 | $12,160 | Not Implemented |
UD0866 # 04 Y:2012 | 04 | 2012 | INSTALL OCCUPANCY SENSORS | $5,702 | $140 | Not Implemented |
UD0866 # 05 Y:2012 | 05 | 2012 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $5,120 | $10,460 | Not Implemented |
UD0866 # 06 Y:2012 | 06 | 2012 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $7,378 | $22,134 | Implemented |
UD0866 # 07 Y:2012 | 07 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $3,740 | $0 | Implemented |
UD0866 # 08 Y:2012 | 08 | 2012 | UPGRADE CONTROLS ON COMPRESSORS | $3,050 | $0 | Not Implemented |
UD0866 # 09 Y:2012 | 09 | 2012 | USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES | $583 | $1,300 | Not Implemented |
UD0866 # 10 Y:2012 | 10 | 2012 | USE MINIMUM STEAM OPERATING PRESSURE | $83,103 | $83,103 | Implemented |
UD0866 # 11 Y:2012 | 11 | 2012 | REPAIR OR REPLACE STEAM TRAPS | $28,807 | $0 | Implemented |
UD0866 # 12 Y:2012 | 12 | 2012 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $12,878 | $20,000 | Not Implemented |
UD0866 # 13 Y:2012 | 13 | 2012 | USE MINIMUM STEAM OPERATING PRESSURE | $10,985 | $32,955 | Not Implemented |
UD0866 # 14 Y:2012 | 14 | 2012 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $10,212 | $8,000 | Not Implemented |
UD0866 # 15 Y:2012 | 15 | 2012 | INSTALL / REPAIR INSULATION ON STEAM LINES | $9,098 | $10,982 | Implemented |