IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

11,865

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
SF0437 # 09 Y:2013 09 2013 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $2,489 $13,500 Implemented
SD0475 # 01 Y:2013 01 2013 REDUCE SCRAP PRODUCTION $478,006 $153,240 Not Implemented
SD0475 # 02 Y:2013 02 2013 USE COOLING TOWER OR ECONOMIZER TO REPLACE CHILLER COOLING $74,589 $105,000 Not Implemented
SD0475 # 03 Y:2013 03 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $72,583 $20,000 Not Implemented
SD0475 # 04 Y:2013 04 2013 INSULATE BARE EQUIPMENT $38,801 $8,131 Not Implemented
SD0475 # 05 Y:2013 05 2013 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $32,247 $22,575 Not Implemented
SD0475 # 06 Y:2013 06 2013 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS $31,432 $18,685 Not Implemented
SD0475 # 07 Y:2013 07 2013 USE POWER DURING OFF-PEAK PERIODS $14,075 $28,900 Implemented
SD0475 # 08 Y:2013 08 2013 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $13,799 $24,000 Not Implemented
SD0475 # 09 Y:2013 09 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $12,883 $30,800 Implemented
SD0475 # 10 Y:2013 10 2013 USE PHOTOCELL CONTROLS $3,183 $3,515 Implemented
SD0475 # 11 Y:2013 11 2013 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $1,517 $4,185 Not Implemented
SD0475 # 12 Y:2013 12 2013 INSTALL TIMERS AND/OR THERMOSTATS $1,418 $1,750 Not Implemented
SD0469 # 01 Y:2013 01 2013 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD $37,421 $53,250 Implemented
SD0469 # 02 Y:2013 02 2013 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT $23,156 $8,740 Not Implemented
SD0469 # 03 Y:2013 03 2013 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL $15,384 $50,200 Not Implemented
SD0469 # 04 Y:2013 04 2013 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $10,246 $10,350 Not Implemented
SD0469 # 05 Y:2013 05 2013 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $10,014 $15,500 Not Implemented
SD0469 # 06 Y:2013 06 2013 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT $7,769 $7,320 Not Implemented
SD0469 # 07 Y:2013 07 2013 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS $3,825 $1,500 Not Implemented
SD0469 # 08 Y:2013 08 2013 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,817 $600 Not Implemented
SD0469 # 09 Y:2013 09 2013 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,250 $200 Implemented
SD0473 # 01 Y:2013 01 2013 INSULATE BARE EQUIPMENT $13,184 $13,290 Implemented
SD0473 # 02 Y:2013 02 2013 INCREASE AMOUNT OF CONDENSATE RETURNED $9,120 $8,000 Not Implemented
SD0473 # 03 Y:2013 03 2013 REDUCE EXCESS STEAM BLEEDING $8,903 $24,743 Implemented