IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,708

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
MI0037 # 01 Y:2002 01 2002 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES $31,994 $1 Implemented
MI0037 # 02 Y:2002 02 2002 UPGRADE OBSOLETE EQUIPMENT $12,400 $24,000 Implemented
MI0037 # 03 Y:2002 03 2002 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $7,361 $120 Implemented
MI0037 # 04 Y:2002 04 2002 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION $12,505 $1,250 Not Implemented
MI0037 # 05 Y:2002 05 2002 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME $2,419 $250 Implemented
MI0037 # 06 Y:2002 06 2002 INSTALL SOFT-START TO ELIMINATE NUISANCE TRIPS $7,104 $3,545 Not Implemented
NC0233 # 01 Y:2002 01 2002 BURN WOOD BY-PRODUCTS FOR HEAT $55,321 $109,000 n/a
NC0233 # 02 Y:2002 02 2002 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $6,359 $2,000 Implemented
NC0233 # 03 Y:2002 03 2002 IMPROVE SPACE COMFORT CONDITIONING $75,150 $10,000 Implemented
NC0233 # 04 Y:2002 04 2002 DEVELOP A REPAIR/REPLACE POLICY $293 $778 Implemented
NC0233 # 05 Y:2002 05 2002 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $186 $289 Not Implemented
SD0294 # 01 Y:2002 01 2002 PREHEAT BOILER MAKEUP WATER WITH WASTE PROCESS HEAT $9,512 $6,000 Not Implemented
SD0294 # 02 Y:2002 02 2002 ISOLATE HOT OR COLD EQUIPMENT $3,123 $5,200 Not Implemented
SD0294 # 03 Y:2002 03 2002 REPLACE OBSOLETE BURNERS WITH MORE EFFICIENT ONES $4,969 $2,000 Not Implemented
SD0294 # 04 Y:2002 04 2002 USE HIGHEST TEMPERATURE FOR CHILLING OR COLD STORAGE $501 $20 Not Implemented
SD0294 # 05 Y:2002 05 2002 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) $10,904 $2,000 Implemented
LE0134 # 01 Y:2002 01 2002 OPTIMIZE PLANT POWER FACTOR $10,572 $15,000 Not Implemented
LE0134 # 02 Y:2002 02 2002 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO $23,457 $1,500 Implemented
LE0134 # 03 Y:2002 03 2002 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,609 $25,249 Implemented
LE0134 # 04 Y:2002 04 2002 INSTALL OCCUPANCY SENSORS $433 $900 Not Implemented
LE0134 # 05 Y:2002 05 2002 MODERATE COOLING TOWER OUTLET TEMPERATURE $1,721 $245 Not Implemented
LE0134 # 06 Y:2002 06 2002 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,676 $1,200 Implemented
AM0418 # 01 Y:2002 01 2002 REPAIR OR REPLACE STEAM TRAPS $33,700 $4,735 Implemented
AM0418 # 02 Y:2002 02 2002 INSTALL EQUIPMENT TO MOVE PRODUCT $20,000 $6,000 Implemented
AM0418 # 03 Y:2002 03 2002 REPAIR AND ELIMINATE STEAM LEAKS $9,500 $200 Implemented