IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

4,204

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
WV0338 # 15 Y:2006 15 2006 REMOVE OR CLOSE OFF UNNEEDED COMPRESSED AIR LINES $310 $0 Implemented
CO0583 # 01 Y:2006 01 2006 USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT $213,730 $703,800 Not Implemented
CO0583 # 02 Y:2006 02 2006 REDUCE DEFECTS BY REDUCING PRODUCT TIPPING $31,500 $1,420 Implemented
CO0583 # 03 Y:2006 03 2006 INSTALL / REPAIR INSULATION ON STEAM LINES $5,120 $4,920 Implemented
CO0583 # 04 Y:2006 04 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,990 $200 Implemented
CO0583 # 05 Y:2006 05 2006 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $480 $165 Implemented
CO0583 # 06 Y:2006 06 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $34,970 $37,470 Not Implemented
CO0583 # 07 Y:2006 07 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $9,400 $9,510 Implemented
CO0583 # 08 Y:2006 08 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $3,800 $2,380 Implemented
CO0583 # 09 Y:2006 09 2006 USE SOLAR HEAT TO MAKE ELECTRICTY $1,450 $18,370 Not Implemented
WV0337 # 01 Y:2006 01 2006 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $64,554 $123,600 Implemented
WV0337 # 02 Y:2006 02 2006 TURN OFF EQUIPMENT WHEN NOT IN USE $5,455 $800 Implemented
WV0337 # 03 Y:2006 03 2006 INSULATE BARE EQUIPMENT $5,170 $2,156 Implemented
WV0337 # 04 Y:2006 04 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,690 $0 Implemented
WV0337 # 05 Y:2006 05 2006 MINIMIZE USE OF OUTSIDE MAKE-UP AIR FOR VENTILATION EXCEPT WHEN USED FOR ECONOMIZER CYCLE $3,170 $2,350 Not Implemented
WV0337 # 06 Y:2006 06 2006 DEVELOP A REPAIR/REPLACE POLICY $2,233 $760 Implemented
WV0337 # 07 Y:2006 07 2006 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,082 $590 Implemented
WV0337 # 08 Y:2006 08 2006 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,981 $80 Implemented
WV0337 # 09 Y:2006 09 2006 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $1,846 $2,185 Not Implemented
WV0337 # 10 Y:2006 10 2006 USE SYNTHETIC LUBRICANT $1,777 $0 Implemented
WV0337 # 11 Y:2006 11 2006 INSTALL OUTSIDE AIR DAMPER / ECONOMIZER ON HVAC UNIT $1,749 $2,400 Not Implemented
WV0337 # 12 Y:2006 12 2006 UTILIZE A LESS EXPENSIVE COOLING METHOD $1,100 $1,308 Not Implemented
WV0337 # 13 Y:2006 13 2006 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $674 $1,280 Implemented
OK0726 # 01 Y:2006 01 2006 COOL COMPRESSOR AIR INTAKE WITH HEAT EXCHANGER $1,838 $2,305 Not Implemented
OK0726 # 02 Y:2006 02 2006 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED $11,412 $13,554 Not Implemented