IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,485

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BS0119 # 02 Y:2019 02 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $126 $165 Not Implemented
BS0119 # 03 Y:2019 03 2019 REDUCE COMBUSTION AIR FLOW TO OPTIMUM $2,022 $30 Not Implemented
BS0119 # 04 Y:2019 04 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $658 $20 Not Implemented
WV0572 # 01 Y:2019 01 2019 ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM $12,987 $1,000 Implemented
WV0572 # 02 Y:2019 02 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $6,442 $38,062 Not Implemented
WV0572 # 03 Y:2019 03 2019 PROVIDE PROPER MAINTENANCE OF MOTOR DRIVEN EQUIPMENT $6,835 $6,336 Not Implemented
WV0572 # 04 Y:2019 04 2019 INSTALL OCCUPANCY SENSORS $5,205 $2,889 Implemented
WV0572 # 05 Y:2019 05 2019 DEVELOP A REPAIR/REPLACE POLICY $2,814 $587 Implemented
WV0572 # 06 Y:2019 06 2019 OPTIMIZE PLANT POWER FACTOR $5,232 $5,400 Not Implemented
AS0468 # 01 Y:2019 01 2019 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS $282,838 $718,201 Implemented
AS0468 # 02 Y:2019 02 2019 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE $133,287 $240,000 Implemented
AS0468 # 03 Y:2019 03 2019 AIR CONDITION ONLY SPACE NECESSARY $12,668 $21,240 Implemented
AS0468 # 04 Y:2019 04 2019 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS $2,290 $400 Implemented
LS1905 # 01 Y:2019 01 2019 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $2,092 $50 Implemented
LS1905 # 02 Y:2019 02 2019 IMPLEMENT A REGULAR MAINTENANCE PROGRAM TO REDUCE EMISSIONS FROM LEAKY VALVES AND PIPE FITTINGS $2,408 $0 Implemented
LS1905 # 03 Y:2019 03 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $24,304 $6,000 Not Implemented
LS1905 # 04 Y:2019 04 2019 INSTALL / REPAIR INSULATION ON STEAM LINES $1,865 $3,000 Implemented
LS1905 # 05 Y:2019 05 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $12,646 $10,000 Implemented
CL1903 # 01 Y:2019 01 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,099 $450 Not Implemented
CL1903 # 02 Y:2019 02 2019 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $74,869 $246,400 Not Implemented
CL1903 # 03 Y:2019 03 2019 USE POWER DURING OFF-PEAK PERIODS $14,816 $1,000 Not Implemented
OK1003 # 01 Y:2019 01 2019 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $2,820 $1,545 Implemented
OK1003 # 02 Y:2019 02 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $2,094 $11,817 Implemented
OK1003 # 03 Y:2019 03 2019 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $13,476 $56,018 Implemented
OK1003 # 04 Y:2019 04 2019 PREHEAT COMBUSTION AIR WITH WASTE HEAT $1,431 $7,700 Not Implemented