Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
4,184
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UM0137 # 03 Y:1999 | 03 | 1999 | IMPROVE SPACE COMFORT CONDITIONING | $4,047 | $16,100 | Implemented |
UM0137 # 04 Y:1999 | 04 | 1999 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $164,382 | $400,000 | Not Implemented |
UM0136 # 01 Y:1999 | 01 | 1999 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $9,707 | $9,821 | Implemented |
UM0136 # 02 Y:1999 | 02 | 1999 | AIR CONDITION ONLY SPACE NECESSARY | $1,684 | $400 | Implemented |
UM0136 # 03 Y:1999 | 03 | 1999 | REPAIR FURNACES AND OVEN DOORS SO THAT THEY SEAL EFFICIENTLY | $1,436 | $600 | Not Implemented |
UM0136 # 04 Y:1999 | 04 | 1999 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $2,058 | $2,250 | Not Implemented |
UM0136 # 05 Y:1999 | 05 | 1999 | DEMOLISH OLD BUILDING TO REDUCE TAX AND INSURANCE BILLS | $48,776 | $103,584 | Not Implemented |
UM0135 # 01 Y:1999 | 01 | 1999 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $6,898 | $20,000 | Implemented |
UM0135 # 02 Y:1999 | 02 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $453 | $1,250 | Not Implemented |
UM0135 # 03 Y:1999 | 03 | 1999 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $2,690 | $50 | Implemented |
UM0135 # 04 Y:1999 | 04 | 1999 | REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS | $2,660 | $2,500 | Implemented |
UM0135 # 05 Y:1999 | 05 | 1999 | INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS | $986 | $1,500 | Implemented |
UM0135 # 06 Y:1999 | 06 | 1999 | CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS | $735 | $100 | Implemented |
UM0134 # 01 Y:1999 | 01 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $1,206 | $1,000 | Not Implemented |
UM0134 # 02 Y:1999 | 02 | 1999 | USE INSULATION IN FURNACES TO FACILITATE HEATING / COOLING | $11,967 | $2,000 | Not Implemented |
UM0134 # 03 Y:1999 | 03 | 1999 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $27,764 | $36,550 | Not Implemented |
UM0134 # 04 Y:1999 | 04 | 1999 | REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS | $1,800 | $0 | Not Implemented |
UM0134 # 05 Y:1999 | 05 | 1999 | ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK | $944,916 | $200,000 | Not Implemented |
UM0133 # 01 Y:1999 | 01 | 1999 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $2,000 | $2,000 | Implemented |
UM0133 # 02 Y:1999 | 02 | 1999 | IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS | $35,000 | $43,000 | Implemented |
UM0133 # 03 Y:1999 | 03 | 1999 | MINIMIZE WATER USAGE | $35,600 | $5,500 | Implemented |
UM0133 # 04 Y:1999 | 04 | 1999 | REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER | $21,232 | $14,700 | Implemented |
UM0133 # 05 Y:1999 | 05 | 1999 | USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION | $259,748 | $13,300 | Implemented |
UM0133 # 06 Y:1999 | 06 | 1999 | USE REVERSE OSMOSIS TO CONCENTRATE MATERIAL | $307,747 | $800,000 | n/a |
UM0133 # 07 Y:1999 | 07 | 1999 | BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE | $25,360 | $15,700 | Not Implemented |