Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
9,942
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
UD0866 # 16 Y:2012 | 16 | 2012 | USE EXCESS COLD PROCESS FLUID FOR INDUSTRIAL COOLING NEEDS | $7,283 | $15,600 | Not Implemented |
UD0865 # 01 Y:2012 | 01 | 2012 | OPTIMIZE PLANT POWER FACTOR | $3,291 | $8,000 | Not Implemented |
UD0865 # 02 Y:2012 | 02 | 2012 | INSTALL OCCUPANCY SENSORS | $4,289 | $1,200 | Not Implemented |
UD0865 # 03 Y:2012 | 03 | 2012 | USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS | $30,494 | $36,750 | Not Implemented |
UD0865 # 04 Y:2012 | 04 | 2012 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $1,395 | $1,000 | Not Implemented |
UD0865 # 05 Y:2012 | 05 | 2012 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $1,071 | $1,500 | Not Implemented |
UD0865 # 06 Y:2012 | 06 | 2012 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $992 | $1,000 | Not Implemented |
UD0865 # 07 Y:2012 | 07 | 2012 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $966 | $1,600 | Not Implemented |
UD0865 # 08 Y:2012 | 08 | 2012 | ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO | $5,463 | $0 | Not Implemented |
UD0865 # 09 Y:2012 | 09 | 2012 | REDUCE COMBUSTION AIR FLOW TO OPTIMUM | $4,015 | $9,000 | Not Implemented |
UD0865 # 10 Y:2012 | 10 | 2012 | USE OUTSIDE COLD WATER SOURCE AS A SUPPLY OF COOLING WATER | $3,073 | $9,219 | Not Implemented |
UD0865 # 11 Y:2012 | 11 | 2012 | RECOVER WASTE HEAT FROM EQUIPMENT | $42,877 | $83,500 | Not Implemented |
UD0865 # 12 Y:2012 | 12 | 2012 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $20,832 | $25,000 | Not Implemented |
UD0865 # 13 Y:2012 | 13 | 2012 | UTILIZE A LESS EXPENSIVE COOLING METHOD | $15,846 | $24,600 | Not Implemented |
UD0865 # 14 Y:2012 | 14 | 2012 | AVOID FROST FORMATION ON EVAPORATORS | $7,322 | $0 | Not Implemented |
UD0865 # 15 Y:2012 | 15 | 2012 | BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT | $14,957 | $123,000 | Not Implemented |
UD0864 # 01 Y:2012 | 01 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,307 | $2,925 | Implemented |
UD0864 # 02 Y:2012 | 02 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,307 | $2,925 | Implemented |
UD0864 # 03 Y:2012 | 03 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,365 | $2,650 | Implemented |
UD0864 # 04 Y:2012 | 04 | 2012 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $2,365 | $2,650 | Implemented |
UD0864 # 05 Y:2012 | 05 | 2012 | UPGRADE CONTROLS ON COMPRESSORS | $5,184 | $0 | Not Implemented |
UD0864 # 06 Y:2012 | 06 | 2012 | INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS | $888 | $1,300 | Implemented |
UD0864 # 07 Y:2012 | 07 | 2012 | TURN OFF EQUIPMENT WHEN NOT IN USE | $1,934 | $0 | Implemented |
UD0864 # 08 Y:2012 | 08 | 2012 | USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT | $191,536 | $383,074 | Not Implemented |
UD0864 # 09 Y:2012 | 09 | 2012 | REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL | $27,112 | $122,500 | Not Implemented |