Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
3,715
matching recommendationsRow Colors Legend |
---|
no implementation information |
Implemented |
NOT Implemented |
ID | # | Year | Products | Savings | Cost | Status |
---|---|---|---|---|---|---|
MA0754 # 01 Y:2016 | 01 | 2016 | USE COMBINED CYCLE GAS TURBINE GENERATOR SETS WITH WASTE HEAT BOILERS CONNECTED TO TURBINE EXHAUST | $1,595,248 | $5,445,000 | Not Implemented |
MA0754 # 02 Y:2016 | 02 | 2016 | CHILL WATER TO THE HIGHEST TEMPERATURE POSSIBLE | $112,215 | $1,000 | Not Implemented |
MA0754 # 03 Y:2016 | 03 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $71,309 | $500,000 | Not Implemented |
MA0754 # 04 Y:2016 | 04 | 2016 | INCREASE AMOUNT OF CONDENSATE RETURNED | $62,104 | $250,000 | Not Implemented |
MA0754 # 05 Y:2016 | 05 | 2016 | METER RECYCLED WATER (TO REDUCE SEWER CHARGES) | $34,769 | $3,000 | Implemented |
MA0754 # 06 Y:2016 | 06 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $25,043 | $13,895 | Implemented |
MA0754 # 07 Y:2016 | 07 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $6,913 | $4,940 | Implemented |
MA0754 # 08 Y:2016 | 08 | 2016 | REPLACE ELECTRIC MOTOR WITH FOSSIL FUEL ENGINE | $1,151 | $500 | Not Implemented |
OK0933 # 01 Y:2016 | 01 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $32,999 | $48,276 | Implemented |
OK0933 # 02 Y:2016 | 02 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $4,290 | $20,770 | Implemented |
OK0933 # 03 Y:2016 | 03 | 2016 | UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS | $1,485 | $7,280 | Implemented |
OK0933 # 04 Y:2016 | 04 | 2016 | UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED | $3,259 | $0 | Implemented |
OK0933 # 05 Y:2016 | 05 | 2016 | INCREASE AMOUNT OF CONDENSATE RETURNED | $24,062 | $20,162 | Implemented |
OK0933 # 06 Y:2016 | 06 | 2016 | USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT | $2,272 | $3,404 | Implemented |
OK0933 # 07 Y:2016 | 07 | 2016 | REPAIR AND ELIMINATE STEAM LEAKS | $353 | $240 | Implemented |
OK0933 # 08 Y:2016 | 08 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $16,193 | $83,117 | Not Implemented |
OK0933 # 09 Y:2016 | 09 | 2016 | ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES | $8,966 | $2,400 | Implemented |
OK0933 # 10 Y:2016 | 10 | 2016 | USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM | $22,618 | $10,720 | Not Implemented |
OK0933 # 11 Y:2016 | 11 | 2016 | USE WASTE HEAT WITH A CLOSED-CYCLE GAS TURBINE-GENERATOR SET TO COGENERATE ELECTRICITY AND HEAT | $285,555 | $1,927,657 | Not Implemented |
OK0933 # 12 Y:2016 | 12 | 2016 | SELL COMBUSTIBLE WASTE | $24,120 | $480 | Not Implemented |
WV0522 # 01 Y:2016 | 01 | 2016 | USE / PURCHASE OPTIMUM SIZED COMPRESSOR | $3,759 | $1,510 | Not Implemented |
WV0522 # 02 Y:2016 | 02 | 2016 | INSULATE BARE EQUIPMENT | $3,281 | $6,551 | Not Implemented |
WV0522 # 03 Y:2016 | 03 | 2016 | INSTALL SET-BACK TIMERS | $1,381 | $3,265 | Implemented |
WV0522 # 04 Y:2016 | 04 | 2016 | REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED | $1,154 | $77 | Implemented |
WV0522 # 05 Y:2016 | 05 | 2016 | ESTABLISH A PREDICTIVE MAINTENANCE PROGRAM | $996 | $1,000 | Implemented |