IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

5,105

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
AM0440 # 01 Y:2003 01 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $5,150 $500 Implemented
AM0440 # 02 Y:2003 02 2003 REUSE RAGS UNTIL COMPLETELY SOILED $4,500 $0 Implemented
AM0440 # 03 Y:2003 03 2003 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $4,010 $340 Not Implemented
AM0440 # 04 Y:2003 04 2003 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES $7,553 $800 Implemented
AM0440 # 05 Y:2003 05 2003 $1,490 $2,880 Implemented
AM0440 # 06 Y:2003 06 2003 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED $830 $42 Implemented
AM0440 # 07 Y:2003 07 2003 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $240 $145 Implemented
WI0445 # 01 Y:2003 01 2003 REPLACE CLOTH RAGS WITH PAPER TOWELS $4,725 $0 Implemented
WI0445 # 02 Y:2003 02 2003 USE FILTER AND DRYING OVEN TO REDUCE SLUDGE VOLUME $3,022 $10,000 n/a
WI0445 # 03 Y:2003 03 2003 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM $2,188 $4,400 Not Implemented
WI0445 # 04 Y:2003 04 2003 CONVERT TO HIGH VOLUME LOW PRESSURE (HVLP) PAINT GUNS $1,188 $1,000 Not Implemented
WI0445 # 05 Y:2003 05 2003 UPGRADE CONTROLS ON COMPRESSORS $1,111 $2,500 Not Implemented
WI0445 # 06 Y:2003 06 2003 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS $422 $640 Implemented
UM0233 # 01 Y:2003 01 2003 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER $41,800 $32,000 Not Implemented
UM0233 # 02 Y:2003 02 2003 RECOVER WASTE HEAT FROM EQUIPMENT $2,064 $500 Implemented
UM0233 # 03 Y:2003 03 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $1,745 $150 Implemented
UM0233 # 04 Y:2003 04 2003 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,037 $50 Implemented
UM0233 # 05 Y:2003 05 2003 REPLACE CITY WATER WITH RECYCLED WATER VIA COOLING TOWER $26,000 $119,000 Implemented
TA0055 # 01 Y:2003 01 2003 CHANGE RATE SCHEDULES OR OTHER CHANGES IN UTILITY SERVICE $68,000 $0 Implemented
TA0055 # 02 Y:2003 02 2003 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $36,000 $31,820 Implemented
TA0055 # 03 Y:2003 03 2003 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA $14,100 $46 Implemented
TA0055 # 04 Y:2003 04 2003 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $9,400 $910 Implemented
TA0055 # 05 Y:2003 05 2003 CONTRACT A WOOD PALLET RECYCLING COMPANY $9,360 $0 Implemented
TA0055 # 06 Y:2003 06 2003 USE PROPERLY DESIGNED AND SIZED HVAC EQUIPMENT $5,260 $2,000 Not Implemented
TA0055 # 07 Y:2003 07 2003 RECYCLE AIR FOR HEATING, VENTILATION AND AIR CONDITIONING $1,675 $1,000 Implemented