IAC logo
Search IAC Recommendations
Sponsored by:
DOE MESC
IAC logo
Search IAC Recommendations
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

8,718

matching recommendations
Reset
Row Colors Legend
no implementation information
Implemented
NOT Implemented
ID # Year Products Savings Cost Status
BD0296 # 08 Y:2005 08 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $846 $650 Implemented
BD0296 # 09 Y:2005 09 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $499 $0 Not Implemented
BD0296 # 10 Y:2005 10 2005 USE AN ALTERNATIVE DESULFURIZING AGENT TO ELIMINATE HAZARDOUS SLAG FORMATION $192,926 $3,000 Implemented
IC0109 # 01 Y:2005 01 2005 MODIFY WORKLOAD $25,000 $0 Implemented
IC0109 # 02 Y:2005 02 2005 INSTALL WASTE HEAT BOILER TO PRODUCE STEAM $437,212 $3,259,200 Not Implemented
IC0109 # 03 Y:2005 03 2005 REPLACE BOILER $294,938 $501,372 Not Implemented
IC0109 # 04 Y:2005 04 2005 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT $17,632 $22,464 Not Implemented
IC0109 # 05 Y:2005 05 2005 REPAIR AND ELIMINATE STEAM LEAKS $1,239 $400 Implemented
IC0109 # 06 Y:2005 06 2005 INSTALL / REPAIR INSULATION ON CONDENSATE LINES $37,809 $131,160 Not Implemented
IC0109 # 07 Y:2005 07 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $36,496 $2,100 Implemented
BD0293 # 01 Y:2005 01 2005 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS $14,847 $2,400 Implemented
BD0293 # 02 Y:2005 02 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $4,468 $5,250 Not Implemented
BD0293 # 03 Y:2005 03 2005 RECOVER WASTE HEAT FROM EQUIPMENT $824 $2,100 Implemented
BD0293 # 04 Y:2005 04 2005 INSTALL OCCUPANCY SENSORS $1,306 $1,125 Implemented
BD0293 # 05 Y:2005 05 2005 USE POWER DURING OFF-PEAK PERIODS $950 $1,700 Implemented
BD0293 # 06 Y:2005 06 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $740 $700 Implemented
BD0293 # 07 Y:2005 07 2005 USE CLOSED CYCLE PROCESS TO MINIMIZE WASTE WATER PRODUCTION $4,251 $1,250 Implemented
BD0293 # 08 Y:2005 08 2005 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER $1,306 $3,500 Not Implemented
BD0295 # 01 Y:2005 01 2005 AVOID COOLING OF PROCESS STREAMS OR MATERIALS THAT MUST SUBSEQUENTLY BE HEATED $32,765 $600 Implemented
BD0295 # 02 Y:2005 02 2005 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS $15,254 $8,470 Implemented
BD0295 # 03 Y:2005 03 2005 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES $14,391 $900 Implemented
BD0295 # 04 Y:2005 04 2005 INSTALL OCCUPANCY SENSORS $14,253 $2,875 Implemented
BD0295 # 05 Y:2005 05 2005 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS $5,487 $3,000 Implemented
BD0295 # 06 Y:2005 06 2005 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED $1,724 $0 Implemented
BD0295 # 07 Y:2005 07 2005 INSULATE BARE EQUIPMENT $423 $0 Implemented